首页> 外文会议>AusIMM Underground Operators Conference >How a frontline planning and commitment system improves trust, commitment and results in operations
【24h】

How a frontline planning and commitment system improves trust, commitment and results in operations

机译:前线规划和承诺系统如何提高运营的信任,承诺和结果

获取原文

摘要

As more than a few mines gradually sink under the weight of emails, whiteboards, notice boards and ever more complex spreadsheets, the holy grail of effective short-term interval planning and control in underground mines is as far away as ever. Despite the mining industry investing ever greater amounts in planning and Enterprise Resource Planning systems, short-term plans become ever more complex and rigid. What the industry desperately needs are not more 'disembodied voices down the speaking tubes', but flexible and effective planning systems that encourage people to make reasonable commitments to each other so that everyone can work as a coordinated team to complete the work required each shift.One solution to the challenge has emerged. This paper describes the 'Fewzion' shift planning and short interval control system which has been developed at Anglo American's Moranbah North and Glencore's Oaky Creek coalmines in Central Queensland. Fewzion has drawn on management theory embodied in Management Operating Systems, Lean and Theory of Constraints approaches to continuous improvement to play a key role in both mines achieving record breaking tonnages.In addition to explaining the Fewzion approach, a case study is presented describing how Anglo American's Moranbah North improved production by 39 per cent in 2014/2015 and won 'Coalmine of the Year' two out of the last four years and how Glencore's Oaky Creek sustainably improved monthly development meters by 34 per cent within two months of implementing Fewzion.
机译:由于超过几个矿山逐渐下沉,白板,布告板和更复杂的电子表格,在地下地雷有效的短期间隔规划和控制的圣杯,与以往一样远。尽管采矿业投资规划和企业资源规划系统的较大量大,但短期计划变得更加复杂和僵硬。行业拼命需求的迫切需要是什么并不是“失控的声音,即鼓励人们对彼此合理承诺的灵活性和有效的规划制度,以便每个人都可以作为协调的团队完成所需工作所需的工作。出现了一个解决挑战的解决方案。本文介绍了在昆士兰中部盎格鲁美国莫兰巴北部和格伦兰橡木溪煤层开发的“少年”的换档规划和短暂的控制系统。少年已经绘制了管理理论,体现在管理操作系统,瘦和约束理论方面,持续改进,在达到记录暂停吨位的矿山中发挥关键作用。除了解释雄性的方法,呈现了案例研究,描述了如何说明Anglo美国的莫兰巴北改进生产了39%的2014/2015,两次获得了“年度煤矿”走出过去的四年中,如何嘉能可的橡木小河持续了34%2个月实施Fewzion内提高每月开发米。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号