Optimal Reduction of Project Risk Severity: A Case Study

机译:项目风险严重程度最佳减少:案例研究

获取原文

摘要

Although many studies were carried out to identify the range of risky events in construction projects and the recommended response and precautionary strategies, little has addressed the means of making such decisions in an optimal way. Unfortunately, complex projects are marred with numerous interconnected causes and effects, which make project dynamics rather difficult to understand and control. A research was undertaken to optimize risk treatment in construction projects, where costs and benefits are balanced out at the project level. Study employs ant colony optimization (ACO) and dynamic risk maps (DRM) to achieve the sought research goal. This paper focuses on presenting the mechanics of the research approach via a real life case study. The construction project into consideration was executed by a well-known contractor in the Middle East. The paper first describes the case details. After the identification of project risk events, the risk inter-dependencies were modelled using a DRM, which made use of the professional knowledge of industry professionals and archived project records as well. Furthermore, ACO is utilized for the balanced selection of risk treatment strategies and to help reduce the project's overall risk severity at the minimum cost possible. Paper ends with useful insights into the research approach and outcomes of case study application.
机译:虽然进行了许多研究以确定建设项目中的风险事件范围和建议的反应和预防策略,但很少有解决方法以最佳方式制定此类决策。不幸的是,复杂的项目与许多互连的原因和效果产生了损害,这使得项目动态相当难以理解和控制。开展了一项研究,以优化建设项目的风险待遇,其中成本和效益在项目水平上均衡。研究采用蚁群优化(ACO)和动态风险地图(DRM)来实现寻求的研究目标。本文侧重于通过现实生活案例研究提出研究方法的机制。考虑到建设项目是由中东的着名承包商执行的。本文首先描述了案例细节。在识别项目风险事件之后,风险依赖性使用DRM进行了建模,这也利用了行业专业人士和存档项目记录的专业知识。此外,ACO用于平衡风险处理策略选择,并有助于以最低的成本降低项目的整体风险严重程度。纸张以有用的见解结束,进入案例研究申请的研究方法和结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号