INTEGRATION OF UNCERTAIN REAL-TIME LOGISTICS DATA FOR REACTIVE SCHEDULING USING FUZZY SET THEORY

机译:使用模糊集理论集成不确定实时物流数据的反应调度

获取原文

摘要

This paper considers the integration of uncertain real-time logistics data for reactive construction scheduling. In order to manage a construction project efficiently, an accurate schedule representing the current project progress is inevitable. The quality and up-to-dateness of such a schedule depends on the availability of real-time data. Typically, real-time logistics data contain information about the availability of material, equipment and personnel as well as delivery dates and site conditions. The accuracy and inherent uncertainty depends on the location where the real-time data was acquired. Currently, the integration of such data into a construction schedule is a very time-consuming, manual and, thus, error-prone process. Therefore, this paper proposes a methodology that enables an automatic integration of such uncertain data into construction schedules. By integrating uncertainties into the existing schedule their impacts on the construction work can be evaluated. For this, discrete event simulation is applied. In order to model uncertain input parameters for simulation models this methodology applies the fuzzy sets theory. In combination with alpha-cut sampling technique, discrete model input parameters are obtained. By applying reactive scheduling with several discrete event simulation experiments, the results can be used to modify construction schedules according to agreed timeframes and costs. In order to demonstrate and validate the presented approach an example is conducted.
机译:本文考虑了不确定的实时物流数据进行无功施工调度的集成。为了有效地管理建筑项目,准确的时间表代表当前项目进度是不可避免的。这种时间表的质量和最新性取决于实时数据的可用性。通常,实时物流数据包含有关材料,设备和人员的可用性以及交货日期和网站条件的信息。准确性和固有的不确定性取决于获取实时数据的位置。目前,将这些数据集成到施工中是非常耗时的,手动,从而易于出错的过程。因此,本文提出了一种方法,使得这种不确定数据能够将这种不确定的数据自动集成到施工方案中。通过将不确定性集成到现有的计划中,可以评估其对施工工作的影响。为此,应用了离散事件仿真。为了模拟仿真模型的不确定输入参数,这种方法适用于模糊集理论。结合Alpha-Cut采样技术,获得了离散模型输入参数。通过使用几种离散事件模拟实验应用反应调度,结果可用于根据商令的时间帧和成本修改施工时间表。为了证明和验证所提出的方法,进行示例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号