Survey of the design of back anchors for tunnel boring machines (TBM), used in the excavation of metro tunnels in Sofia

机译:隧道镗床(TBM)后锚设计的调查,用于索非亚地铁隧道的挖掘

获取原文

摘要

In the year 1974 the Minicipality of Sofia approved the city plan containing the intention to build a metro system in Sofia. The construction works commenced in the year 1982. The route for Sofia metro Line-1 Extension Project from Sveta Nedelya Square to Vassil Levski Stadium was financed with a loan from Japan International Cooperation Agency(JICA) and was carried out by the Japanese Contractor Taisei Corporation, under contract with the Sofia Minicipality.For this route, with length of 2,4 km, two metro stations, two ventilations shafts and one start shaft, for strengthening of this deep excavations was design and used more than 610 tons temporary steel structures to keep the R.C. wall and pilot in vertically position. Contemporary machine methods of the tunnel excavation in the soft ground in Sofia was used for this route. The machine excavation is executed as a full-face excavation, employing tunnel-boring machines (TBM), with diameter 5820 mm. The paper provides a review of the design approach for three types of temporary steel-frame structures, called "back anchors", used to support the TBM in the beginning of the drilling process, before the TMB enters the tunnel. The paper begins with the choice of structural configuration of the back anchors, used in the excavation of metro tunnels in Sofia. The construction process, the materials used, the static analysis methods and, the monitoring of the structure during the TBM start are also described.
机译:1974年,索非亚的粉末批准了城市计划,其中包括在索非亚建立地铁系统的意图。该建筑工程于1982年开始。从Sveta Nedelya Square到Vassil Levski Stadium的Sofia Metro Line-1扩展项目的路线与日本国际合作机构(JICA)的贷款提供资金,并由日本承包商TaIsie Corporation进行,根据与索非亚山的合同。对于这条路线,长度为2,4公里,两个地铁站,两个通风轴和一个起始轴,用于加强这种深度的挖掘是设计并使用超过610吨临时钢结构的临时钢结构保持rc.墙壁和飞行员在垂直位置。在索非亚的软土局隧道挖掘的现代机方法用于这条路线。机器挖掘作为全面挖掘执行,采用隧道镗床(TBM),直径为5820毫米。本文介绍了三种类型的临时钢框架结构的设计方法,称为“后锚”,用于在TMB进入隧道之前在钻孔过程开始之前支持TBM。本文首先选择了后锚的结构配置,用于索非亚地铁隧道的挖掘。还描述了施工过程,使用的材料,静态分析方法,以及在TBM开始期间的结构监测。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号