Getting Rates Approved in the Big Easy Isn’t Easy

机译:在大容易获得批准的情况并不容易获得批准

获取原文

摘要

The Sewerage and Water Board of New Orleans (SWBNO) is facing significant capital demands to upgrade a system that has been undercapitalized for decades and severely damaged by floodwaters following Hurricane Katrina. At the same time, its financial position has been compromised due to a significantly smaller population base from which to recover these costs. To determine the amount of revenues needed to fully restore the system, the Board of Directors approved a comprehensive financial planning and rate study (Rate Study), which has expanded in scope and increased in duration due to the challenges associated with gaining approval for the proposed rate increases. Utility managers need to be prepared for the various twists and turns that can occur during a rate setting process due to competing interests among and between key stakeholder groups. A strong working relationship between utility staff, key stakeholders, and the consultant will help the utility to meet and overcome these challenges.
机译:新奥尔良(SWBNO)的污水处理和水板面临着升级数十年后遭受的系统,并受到飓风卡特里娜飓风之后受到洪水潜水的严重破坏的重要资本要求。与此同时,由于从中恢复这些成本明显较小的人口基础,其财务状况受到损害。要确定完全恢复系统所需的收入金额,董事会批准了全面的财务规划和率研究(利率研究),其范围扩大,持续时间增加,因为与提出的批准有关的挑战,持续时间速率增加。在主要利益相关者组之间的竞争利益和之间的竞争利益,需要为在速率设定过程中进行的各种曲折进行准备。公用事业人员,关键利益相关者和顾问之间的强大工作关系将有助于该挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号