Getting Rates Approved in the Big Easy Isn’t Easy

机译:轻松获得价格批准并不容易

获取原文
获取原文并翻译 | 示例

摘要

The Sewerage and Water Board of New Orleans (SWBNO) is facing significant capital demandsrnto upgrade a system that has been undercapitalized for decades and severely damaged byrnfloodwaters following Hurricane Katrina. At the same time, its financial position has beenrncompromised due to a significantly smaller population base from which to recover these costs.rnTo determine the amount of revenues needed to fully restore the system, the Board of Directorsrnapproved a comprehensive financial planning and rate study (Rate Study), which has expandedrnin scope and increased in duration due to the challenges associated with gaining approval for thernproposed rate increases. Utility managers need to be prepared for the various twists and turnsrnthat can occur during a rate setting process due to competing interests among and between keyrnstakeholder groups. A strong working relationship between utility staff, key stakeholders, andrnthe consultant will help the utility to meet and overcome these challenges.
机译:新奥尔良下水道与水务局(SWBNO)面临巨大的资金需求,要求升级一个系统,该系统的资本不足已有数十年之久,并且在卡特里娜飓风过后受到洪水的严重破坏。同时,由于要收回这些成本的人口基数要小得多,其财务状况也受到了损害。为了确定完全恢复该系统所需的收入额,董事会批准了一项全面的财务计划和费率研究(利率研究)的范围已经扩大,持续时间也增加了,这是因为要获得提议的利率上调所带来的挑战。由于主要利益相关者群体之间以及利益相关者群体之间的利益冲突,公用事业经理需要为费率制定过程中可能发生的各种曲折做好准备。公用事业人员,关键利益相关者和顾问之间的牢固工作关系将帮助公用事业应对并克服这些挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号