Achieving Rehabilitation Success Globally - Peabody Energy's Experience in Mongolia

机译:全球康复成功 - 皮博迪能源在蒙古的经验

获取原文

摘要

The Ereen Coal Mine, operated as a Peabody joint venture project in Mongolia, suspended operations in early 2009. Consistent with Peabody's policy of environmental stewardship and rehabilitating mine lands, a plan to achieve these goals for the Ereen Mine was initiated in spring 2009. The project would also fulfill the spirit and intent of the 2006 Mongolian Minerals Law. Project development included analysis of environmental baseline conditions and application of best rehabilitation practices necessary to create an erosionally stable landform and restore traditional land use. Mongolian scientists and engineers from Ulaanbaatar teamed with U.S. Peabody engineering and environmental staff to develop and implement a plan to meet Mongolian regulatory requirements and restore pre-mine land capability. The mine area, out-of-pit dumps and adjacent undisturbed lands were surveyed to develop a postmine landscape design to establish through drainage and return a stable landform. The potential backfill material was sampled to identify any spoil that could be unsuitable for plant growth or acid or toxic forming. Backhoes, trucks and dozers accomplished the pit backfilling, final grading and replacing a 20 centimeter topsoil depth. Analysis of adjacent native vegetation was used to develop a seed mix of four native species. Ground water encountered in the pit was traced to an alluvial system allowing development of a shallow well and pond for domestic and livestock use. The project was partially completed in 2009, with final topsoiling and seeding in summer 2010. The Mongolian work force spearheaded on-site management and field implementation, including use of a new type of seeder. A management and monitoring plan was implemented. The project successfully rehabilitated an 18 hectare site to premine conditions and accomplished the first complete coal mine rehabilitation project in the history of Mongolia.
机译:Ereen煤矿作为蒙古的Pealbody合资项目经营,2009年初暂停行动。与Peabody的环境管理和康复矿山的政策一致,计划在2009年春季启动了伊雷森矿的这些目标。该计划项目还将履行2006年蒙古矿业法的精神和意图。项目开发包括对环境基线条件的分析,并在营造侵蚀稳定地貌和恢复传统土地利用所需的最佳康复实践的应用。来自乌兰巴托的蒙古科学家和工程师与美国Peabody Engineering and Environgional员工合作,开发和实施一个计划,以满足蒙古监管要求和恢复雷地雷土地能力。调查了矿区,外坑倾卸和邻近的土地,以开发后期景观设计,建立排水并返回稳定的地貌。取样潜在的回水材料以识别任何可能不适合植物生长或酸或毒性成型的破坏。反向鞋,卡车和换衣夹完成了坑回填,最终分级,更换了20厘米的表土深度。邻近天然植被的分析用于开发出四种天然物种的种子混合物。坑内遇到的地面水追踪到一种允许在国内和牲畜使用的浅井和池塘的开发。该项目于2009年部分地完成,2010年夏季末端脱色和播种。蒙古劳动力在现场管理和现场实施,包括使用新型播种机。实施管理和监测计划。该项目成功地将18公顷的遗址成功地恢复了18公顷的遗址,并在蒙古历史上完成了第一个完整的煤矿康复项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号