首页> 外文会议>World Mining Congress and Exposition >SOFTWARE FOR DESIGN OF DRILLING BLASTING OPERATIONS AT HEPP CONSTRUCTION
【24h】

SOFTWARE FOR DESIGN OF DRILLING BLASTING OPERATIONS AT HEPP CONSTRUCTION

机译:HEPP施工钻井开展设计软件

获取原文

摘要

Drilling and blasting process needs to produce fragment size distributions that are tailored to minimize the production costs and energy consumption including loading, hauling and crushing. This paper presents a part of computer-aided system that can be used for design and planning of open-pit drilling and blasting operations. The case study of software application includes quarry operations in a HEPP Dam construction located at Boyabat / Turkey. To be getting the maximum productivity of the crusher at the quarry, the fragmentation size of the blasted rock material should be inside of the limits of the Passing Size curves of the selected crusher model. The results obtained by the software are compared with actual costs incurred in the field during the construction period and crusher operations. The results of this study, can be used by industry professionals to evaluate different drilling and blasting scenarios.
机译:钻孔和爆破过程需要产生根据生产成本和能耗,包括装载,牵引和破碎的碎片大小分布。本文介绍了计算机辅助系统的一部分,可用于开放式钻井和爆破操作的设计和规划。软件应用程序的案例研究包括位于Boyabat /土耳其的HEPP DAM建筑中的采石场运营。为了获得采石场的破碎机的最大生产率,爆破的岩石材料的碎片尺寸应在所选择的破碎机模型的通过尺寸曲线的限制范围内。将软件获得的结果与施工期间和破碎机操作期间现场产生的实际成本进行比较。本研究的结果可由行业专业人员使用,评估不同的钻井和爆破场景。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号