首页> 外文会议>International Conference on Production Research >PRODUCTION SCHEDULING: AN APPROACH BASED ON PETRI NETS AND GRAPHS SEARCH. STUDY CASE: AGP-COLOMBIA
【24h】

PRODUCTION SCHEDULING: AN APPROACH BASED ON PETRI NETS AND GRAPHS SEARCH. STUDY CASE: AGP-COLOMBIA

机译:生产计划:一种基于Petri网和图形搜索的方法。研究案例:AGP-哥伦比亚

获取原文

摘要

This work presents a solution approach for a real scheduling problem in a bulletproof glass company in Colombia; This company is one of the three bulletproof glass production lines of one of the largest producers of this type of glass in the world. The production system of the production line can be modeled as a Flexible Flow Shop framework; the main features are: batch processing constraints, eligibility of machines and limited capacity of machines among others; the objective function tested was minimizing makespan. Due to the difficulty of modeling real industry problems, this work introduces a methodology which combines both modeling and scheduling using Petri Nets and Heuristics Search methods. Currently the production schedule is prepared by experts in the company who base their decisions primarily on their expertise. Preliminary results have showed improvements around of 5% in the objective function compared with the current practice.
机译:这项工作提出了哥伦比亚防弹玻璃公司实时调度问题的解决方案方法;这家公司是世界上最大的这款玻璃生产线之一的三个防弹玻璃生产线之一。生产线的生产系统可以被建模为柔性流量纸框架;主要特点是:批量处理限制,机器资格以及其他机器容量在其他机器;测试的目标函数最小化了Makespan。由于建模实际产业问题的难度,这项工作介绍了一种使用Petri网和启发式搜索方法结合建模和调度的方法。目前,制作计划由公司的专家编写,他们主要根据其专业知识基于其决定。与目前的实践相比,初步结果显示出目标函数的提高5%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号