首页> 外文会议>International conference on soil mechanics and geotechnical engineering >San Pasquale station of the Linea 6 in Napoli: dewatering field tests, measurements and back-analyses
【24h】

San Pasquale station of the Linea 6 in Napoli: dewatering field tests, measurements and back-analyses

机译:Linea 6在Napoli的San Pasquale车站:脱水现场测试,测量和后析

获取原文

摘要

Since 1839, when the historical railway Napoli - Portici was inaugurated, Napoli has been characterized by a significant system of urban and suburban railways. The idea of a fully integrated urban rail network dates back to the 1950s, but only in 1990s construction began. At present, the system includes 54 km of tracks and 69 stations belonging to 6 lines currently operating; when the City Transport Plan will be completed, 10 lines with 93 km of track and a further 30 km of new light rail linking 114 stations with 21 interchanges are foreseen.
机译:自1839年以来,当历史铁路Napoli - Portici被揭开时,Napoli一直以城市和郊区铁路的重要系统为特征。完全综合的城市铁路网络的想法可以追溯到20世纪50年代,但只有在20世纪90年代的建设开始。目前,该系统包括54公里的轨道和69站,属于目前运行的6行;当城市运输计划将完成时,预计将预见到轨道93公里的轨道和距离新的轻轨114个互换电视台有10千米。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号