【24h】

New Removable Bridge over the Bay of Cadiz

机译:Cadiz湾的新可拆卸桥梁

获取原文

摘要

The construction of the new Bridge over the Bay of Cadiz is necessary to break the secular isolation of the city. This brand new infrastructure must also be respectful and compatible with the local shipyard industry, which has many high-tech facilities inside the bay, employing nowadays more than 6000 workers. Regarding the possibility of the construction of ships or offshore structures with extraordinary dimensions, the new bridge will have a removable span, with 140 m horizontal clearance and no vertical clearance limitations. This original structure, which is in a very advanced stage of construction, will have a single 150 m long steel span with variable depth (between 3 and 8 m) and a 33,2 m wide orthotropic plate. The structural detail design and construction of the bridge is presenting many challenges in relation to its dynamic behaviour, fatigue control, durability and quality control of the manufacturing processes.
机译:Cadiz湾的新桥梁的建造是为了打破城市的世俗孤立。这个全新的基础设施也必须与当地的造船厂行业尤其尊重,兼容海湾内的许多高科技设施,现在使用6000多名工人。关于具有非凡尺寸的船舶或海上结构建造的可能性,新桥将具有可拆卸的跨度,水平间隙140米,没有垂直间隙限制。这种原始结构,在施工非常先进的阶段,将具有单个150米长的钢跨度,可变深度(3至8米)和33,2米宽的正交板。桥梁的结构细节设计与构造是与其动态行为,疲劳控制,耐用性和制造工艺的质量控制的许多挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号