【24h】

New Removable Bridge over the Bay of Cadiz

机译:加的斯湾上的新活动桥

获取原文
获取原文并翻译 | 示例

摘要

The construction of the new Bridge over the Bay of Cadiz is necessary to break the secular isolationrnof the city. This brand new infrastructure must also be respectful and compatible with the localrnshipyard industry, which has many high-tech facilities inside the bay, employing nowadays morernthan 6000 workers. Regarding the possibility of the construction of ships or offshore structures withrnextraordinary dimensions, the new bridge will have a removable span, with 140 m horizontalrnclearance and no vertical clearance limitations. This original structure, which is in a very advancedrnstage of construction, will have a single 150 m long steel span with variable depth (between 3 and 8rnm) and a 33,2 m wide orthotropic plate. The structural detail design and construction of the bridgernis presenting many challenges in relation to its dynamic behaviour, fatigue control, durability andrnquality control of the manufacturing processes.
机译:在加的斯湾建造新的桥梁对于打破城市的世俗隔离是必要的。这种崭新的基础设施还必须尊重当地的造船业,并与海湾内的许多高科技设施相兼容,如今雇用了超过6000名工人。关于建造具有非凡尺寸的船舶或海上结构的可能性,新桥将具有可移动的跨度,水平净空高度为140 m,没有垂直净空限制。这种原始结构处于非常先进的施工阶段,将具有150 m长的单个钢跨度(可变深度(3至8rnm之间))和33.2 m的正交异性板。桥接器的结构细节设计和构造在其动态性能,疲劳控制,耐用性和制造过程的质量控制方面提出了许多挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号