首页> 美国政府科技报告 >Properties of Anchor Rods Removed from San Francisco-Oakland Bay Bridge.
【24h】

Properties of Anchor Rods Removed from San Francisco-Oakland Bay Bridge.

机译:从旧金山 - 奥克兰湾大桥拆除锚杆的性能。

获取原文

摘要

In March 2013, the construction contractor for the new self-anchored suspension bridge between San Francisco and Oakland, CA, tensioned the threaded rods between the bearings/shear keys and the concrete pier cap. Within days of completion, it was discovered that one-third of the rods for the two shear keys on Pier E2 had fractured. An investigation began to determine the root cause for the fractures. The work reported herein was in support of that investigation at the request of the Federal Highway Administration California Division office. It includes data on the mechanical, chemical, and microstructural properties of two samples removed from Pier E2.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号