In 2008, the Queensland Government notionally completed the delivery of the Western Corridor Recycled Water Scheme to bring high-quality recycled water to industry and to supplement drinking water supplies for the region. At a cost of some US$2.2 billion, this includes three advanced water treatment plants and over 200km of large-diameter pipelines with the capacity to deliver up to 232ML/day (61mgd) of recycled water to the region. This paper considers some of the challenges experienced during the commissioning and testing of the scheme, particularly in the advanced water treatment plants. Some observations are made as to ways in which delivery of future schemes could be enhanced.
机译:2008年,昆士兰州政府概念完成了西部走廊再生水计划,为工业提供高质量的再生水,并为该地区补充饮用水供应。其成本为22亿美元,这包括三种先进的水处理厂和超过200公里的大口径管道,能够将高达232毫升/天(61毫克)的再生水送到该地区。本文考虑了对该计划的调试和测试期间经历的一些挑战,特别是在先进的水处理厂。一些观察结果是可以提高未来方案的交付的方式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号