首页> 外文会议>Pipeline Pigging and Integrity Management Conference >A new joint industry project addressing the integrity management of SCC in gas transmission pipelines
【24h】

A new joint industry project addressing the integrity management of SCC in gas transmission pipelines

机译:一个新的联合行业项目,解决了气体传输管道SCC的完整性管理

获取原文

摘要

IN 2006 a group of natural gas transmission pipeline operating companies in North America collaborated in a Joint Industry Project (JEP) to address the Integrity Management of SCC in High Consequence Areas. The outcome of the work was a series of reports examining the occurrence of SCC extending over 40 years up to 2005, and developing experience-based guidance for conducting hydrostatic testing and excavations, for assessing the severity of discovered cracks and for establishing the interval before the next assessment. The outcome was published in ASME STP-PT-011 (2008) and provided the basis for proposed revisions to ASME B31.8S. It also enabled the closer alignment of ASME B31.8S with the revisions to the CEPA Recommended practice for SCC.
机译:2006年,一组天然气传输管道运营公司在北美公司合作,合作在联合行业项目(JEP)中,以解决高后果地区SCC的完整性管理。该工作的结果是一系列报告,审查了40多年的SCC的发生,以及开发用于进行静水检测和挖掘的基于经验的指导,用于评估发现的裂缝的严重程度和建立之前的间隔下一次评估。结果已在Asme STP-PT-011(2008)中公布,并为ASME B31.8S提供了拟议修订的依据。它还使ASME B31.8S与SCC推荐实践的修订更仔细对准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号