【24h】

Flooding of WISMUT's uranium mines after closure - Key findings and unexpected effects

机译:封闭后Wismut铀矿的洪水 - 主要发现和意外效果

获取原文

摘要

The closure of five underground uranium mines is a central issue of the WISMUT project.Based on extensive investigations, controlled mine flooding was identified to be the mostenvironmentally friendly, the technically safest, and hence the most appropriate low-costoption for long term water management. Differing boundary conditions in terms of geology,hydrogeology, and the former mining technology required individual flooding strategies andtechnological arrangements at the various sites. Comprehensive monitoring programs havebeen implemented. By 2008 more than 90 % of the underground workings were flooded, anda number of general findings regarding flood water rise, water quality and stratification in theflood water column, as well as geo-mechanical stability of the surface have been made. Bymeans of selected examples, those findings, but also unexpected effects are described anddiscussed regarding long term challenges.
机译:五个地下铀矿的关闭是Wismut项目的核心问题。基于广泛的调查,被确定的受控矿井洪水是最环保的,技术最安全,因此最适合长期水管理的低成本。在地质,水文地质和前采矿技术方面不同的边界条件需要各个地点的个别洪水策略和技术安排。已经实施了综合监测计划。到2008年,超过90%的地下运作被淹没,以及对泡水升水,水质和水柱中的水质和分层的一般调查结果,以及表面的地球机械稳定性。据各种调查结果,那些结果,也是意想不到的效果,也有关于长期挑战的探讨。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号