首页> 外文会议>Annual Canadian Nuclear Society Conference >A TECHNO-ECONOMIC ASSESSMENT OF PRIMARY HEAT TRANSPORT SYSTEM DECONTAMINATION IN SUPPORT OF DECOMMISSIONING PICKERING NUCLEAR GENERATING STATIONS
【24h】

A TECHNO-ECONOMIC ASSESSMENT OF PRIMARY HEAT TRANSPORT SYSTEM DECONTAMINATION IN SUPPORT OF DECOMMISSIONING PICKERING NUCLEAR GENERATING STATIONS

机译:一种技术经济评估,用于支撑退役核发电站的支撑

获取原文

摘要

The operating reactor units at Pickering are expected to be permanently shut down by approximately 2020 (this nominal date is for planning purposes only) and then decommissioned. OPG has adopted the 'Deferred Dismantling' strategy for decommissioning its nuclear plants. In contrast with prompt dismantling, radioactive decay leads to reduced dose expenditure during deferred dismantling. As part of the decommissioning strategy, chemical decontamination of the primary heat transport (PHT) system may be undertaken prior to Safe Storage. Decommissioning costs depend significantly on the chosen deferral period. The overall objective of the present work was to contribute to the optimization of the existing decommissioning plan by assessing the benefits of decontamination. Accordingly, an overall cost-benefit analysis for PHT system decontamination was performed. Details are presented in this paper.
机译:在皮克林时的操作电抗器单元预计将永久关闭约2020(这个名义日期仅用于规划目的),然后退役。 OPG已采用“延期拆除”战略,即退役其核植物。与迅速拆解相比,放射性衰减导致延迟拆除期间减少剂量支出。作为退役策略的一部分,可以在安全储存之前进行一次热传输(PHT)系统的化学净化。退役费用大大取决于所选的延期期。本工作的总体目标是通过评估净化的益处来促进现有退役计划的优化。因此,进行了PHT系统去污的总体成本效益分析。本文提出了详细信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号