首页> 外文会议>Middle East Oil Gas Show and Conference >Innovative Methodology to Riglessly Restore the Functionality of the Sub-Surface safety valves Sc-SSSV with Damaged Control Line
【24h】

Innovative Methodology to Riglessly Restore the Functionality of the Sub-Surface safety valves Sc-SSSV with Damaged Control Line

机译:通过损坏的控制线来严格恢复子表面安全阀SC-SSSV的功能的创新方法

获取原文

摘要

The company introduced a new era of Well Integrity Management system as a continuous assessment and verification process to ensure the integrity of the wells is designed, monitored and maintained throughout the well life cycle. Failure of any well barriers is not allowed. If a barrier fail , an immediate action should be taken to restore the well integrity, which is one of the important business elements in oil and gas fields; and hence according to well integrity standards utilizing well control devices are mandatory to protect human life, and reduce the potential for environmental pollution in addition to minimize the loss of production. The surface control subsurface safety valve (SC-SSSV) is an integral part of the overall safety system of any well and it is the only method that provides sub-surface isolation in case of emergency due to uncontrolled surface or sub-surface event. Therefore it is mandatory to have functional SC-SSSV installed in the production tubing in all gas and oil wells, irrespective of their location, to stop the flow in case of a catastrophic failure. The SC-SSSV is adjusted to be held in the open position by hydraulic positive pressure from surface. This pressure is applied through a control line in the tubing-casing annulus running from the valve to the surface. In case of an emergency shutdown the hydraulic pressure will be released forcing the safety valve to close. However the control lines could leak, plug or break leading to losing the functionality of the safety valves. The only way to rectify SC-SSSV C/L problems is by a rig work-over to replace with new C/L. This paper describes the innovative methodology, which is the first application in the UAE & Middle East, to install Baker Hughes system “Inject-safe” controlled sub-surface safety valve which has a similar operating philosophy to the conventional SC-SSSV. The “Inject-safe” C/L deployment is on the inside of the tubing which drastically reduces the cost. This unique approach has been successfully executed in one of the super giant onshore fields in Abu Dhabi through an extensive techno-economical study. The paper goes through the methodology of candidates’ selection, the system requirements and modification in wellhead and the trial results through specific testing criteria in one of the wells as part of a field pilot. The risk assessment is also discussed along with the execution process. The cost impact of installing the new system as proved in the pilot through a techno-economical evaluation well will be highlighted, in addition to well performance pre/post installation combined with the project conclusion and recommendation for future implementation.
机译:该公司推出了一个新的诚信管理系统时代,作为连续评估和验证过程,以确保在整个井生命周期中设计,监控和维护井的完整性。不允许任何良好障碍的失败。如果障碍失败,应立即采取行动恢复井的完整性,这是石油和天然气领域的重要业务元素之一;因此,根据利用良好控制装置的良好诚信标准,强制保护人类生命,并减少环境污染的可能性,尽量减少生产损失。表面控制地下安全阀(SC-SSSV)是任何孔的整体安全系统的组成部分,它是由于不受控制的表面或子表面事件而在紧急情况下提供子表面隔离的唯一方法。因此,强制性是在所有气体和油井中安装在生产管中的功能性SC-SSSV,无论它们的位置如何,都要停止灾难性故障的情况。将SC-SSSV调整为通过表面的液压正压力保持在打开位置。通过从阀门运行到表面的管壳环中的控制线施加该压力。在紧急关闭的情况下,液压将迫使安全阀关闭。然而,控制线可能会泄漏,插头或断裂,导致失去安全阀的功能。纠正SC-SSSV C / L问题的唯一方法是通过钻机工作替换为替换新的C / L.本文介绍了创新的方法,这是阿联酋和中东的第一个应用,安装面包馆休斯系统“注入安全”控制的子表面安全阀,其对传统的SC-SSSV具有类似的操作理念。 “注入安全”C / L部署位于管道的内部,其大大降低了成本。通过广泛的技术经济学研究,这种独特的方法已成功地在阿布扎比的超大巨型田地之一。本文通过候选人的选择,系统要求和修改的井口和试验结果,通过特定测试标准作为场飞行员的一部分。风险评估也与执行过程一起讨论。在通过技术经济评估中突出显示,安装新系统的成本影响通过技术经济评估,除了井上/岗位安装,还与项目结合和未来实施建议相结合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号