THE OTJIKOTO GRAVITY CIRCUIT: TEST WORK, DESIGN, COMMISSIONING, AND OPERATION

机译:Otjikoto重力电路:测试工作,设计,调试和操作

获取原文

摘要

The Otjikoto mining and milling complex is 90% owned by B2Gold Corporation, and began commercial operation on February 28, 2015. The milling circuit operates at a throughput 3.3 million tonnes per annum, with an average reserve gold grade of 1.28 g/t. The ore is high in Gravity Recoverable Gold (GRG), which varies between 73-91%, depending on ore type. Overall gold recovery since start-up is 98.2%, with about 63.5 % coming from the gravity circuit as doré. 2016 cash operating costs, and all in sustaining cost (“AISC”) were $361 and $604 per ounce, respectively. During design, three ore types were tested for GRG content, and based on the high GRG value of all three ore types, the decision was made to treat the full ball mill circulating load by gravity. Once operating, the gravity circuit performance was characterized by performing a detailed gravity audit, which included the ore, cyclone classification, Knelson concentrators, and the Consep Acacia intensive leach system. The deeper ores contain significant pyrrhotite, and this created some unusual challenges that had to be overcome. This paper presents the gravity circuit design process, the circuit commissioning, and the audit results and ongoing improvements.
机译:OTJikoto采矿和铣削综合体由B2Gold公司拥有90%,并于2015年2月28日开始商业运营。铣削电路以每年330万吨的吞吐量运营,平均储备金级为1.28克/吨。矿石高,重力可回收金(GRG),其在73-91%之间,这取决于矿石型。自启动以来的总金回收率为98.2%,大约63.5%来自重力电路,如Doré。 2016年现金运营成本,持续成本(“AISC”)分别为361美元,每盎司604美元。在设计期间,测试三种矿体类型的GRG含量,并基于所有三种矿石类型的高GRG值,该决定通过重力处理全球轧机循环负荷。一旦操作,重力电路性能的特征在于进行详细的重力审核,其中包括矿石,旋风分类,镯子集中器和CONSEP金合欢密集型浸出系统。更深的矿石含有显着的Pyrrhotite,这产生了一些必须克服的不寻常挑战。本文介绍了重力电路设计过程,电路调试和审计结果和持续改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号