首页> 外文会议>Annual conference and expo of the International Erosion Control Association >IMPROVING STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION IN SOUTH CAROLINA
【24h】

IMPROVING STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION IN SOUTH CAROLINA

机译:改进南卡罗来纳州公路建设的标准规范

获取原文

摘要

The South Carolina Department of Transportation (SCDOT) implemented several new erosion prevention and sediment control Supplemental Specifications in 2004. After 2-years of implementation, the SCDOT determined that these Supplemental Specifications, along with other existing Specifications, should be evaluated, modified and improved. The categories of Standard Specifications evaluated includes erosion prevention, sediment control, storm water runoff control, and post construction water quality control. The following specific Standard Specifications were evaluated in detail. Bonded Fiber Matrix (BFM), Flexible Growth Matrix (FGM), Inlet Structure Filters, Sediment Tubes, Stabilized Construction Entrance, Compost, Structural Post-construction Water quality Structures, Silt Fence, Temporary Stabilization, Temporary Seeding and Permanent Seeding. Each Standard Specification was evaluated for the following categories: 1. Description 1.1 Unit of measurement for payment. 1.2 Where is the practice applicable. 2. Materials 2.1 Quality assurance 2.2 Quality control 3. Construction Requirements 3.1 Site preparation 3.1 General installation 3.3 Delivery, storage and handling 3.4 Inspection 3.5 Maintenance 3.6 Acceptance Criteria 4. Method of Measurement 5. Method of Payment. The evaluation of the Standard Specifications included interviews with SCDOT construction staff, SCDOT construction inspectors, and other users of the Standard Specifications. The purpose of these interviews was to identify specific inadequacies of the existing Standard Specifications. The evaluation of the Standard Specifications also included correspondence with industry manufacturers to ensure that the Standard Specifications adequately reflect products and measures that are available for distribution. The evaluation of the Standard Specifications included erosion prevention and sediment control site inspections on active SCDOT construction sites. The site inspections were conducted to evaluate the implementation and effectiveness of the Standard Specifications. The improved Standard Specifications will be presented in this technical paper.
机译:南卡罗来纳州运输部(SCDOT)在2004年实施了几种新的侵蚀防护控制补充规范。在实施2年后,SCDOT应确定这些补充规范以及其他现有规格,应评估,修改和改进。 。评估标准规格的类别包括防腐,沉积物控制,雨水径流控制和后施工水质控制。详细评估以下特定的标准规范。粘结纤维基质(BFM),柔性生长基质(FGM),入口结构过滤器,沉积物管,稳定的建筑入口,堆肥,结构后施工水质结构,淤泥围栏,临时稳定,临时播种和永久播种。对以下类别进行评估每个标准规范:1。描述1.1付款单位进行付款。 1.2实践在哪里适用。 2.材料2.1质量保证2.2质量控制3.施工要求3.1现场准备3.1一般安装3.3送货,储存和处理3.4检查3.5维护3.6验收标准4.测量方法5.付款方式。评估标准规范包括与SCDOT建设人员,SCDOT建筑检查员和其他标准规范的其他用户的访谈。这些访谈的目的是确定现有标准规范的特定不足。标准规范的评估还包括与行业制造商的对应,以确保标准规范充分反映可用于分销的产品和措施。标准规范的评估包括积极SCDOT建设场所的防腐和沉积物控制现场检查。进行现场检查以评估标准规格的实施和有效性。本技术论文将提出改进的标准规格。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号