【24h】

IMPROVING STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION IN SOUTH CAROLINA

机译:改善南卡罗来纳州公路建设标准规范

获取原文
获取原文并翻译 | 示例

摘要

The South Carolina Department of Transportation (SCDOT) implemented several new erosion prevention and sediment control Supplemental Specifications in 2004. After 2-years of implementation, the SCDOT determined that these Supplemental Specifications, along with other existing Specifications, should be evaluated, modified and improved.rnThe categories of Standard Specifications evaluated includes erosion prevention, sediment control, storm water runoff control, and post construction water quality control. The following specific Standard Specifications were evaluated in detail. Bonded Fiber Matrix (BFM), Flexible Growth Matrix (FGM), Inlet Structure Filters, Sediment Tubes, Stabilized Construction Entrance, Compost, Structural Post-construction Water quality Structures, Silt Fence, Temporary Stabilization, Temporary Seeding and Permanent Seeding. Each Standard Specification was evaluated for the following categories:rn1. Descriptionrn1.1 Unit of measurement for payment.rn1.2 Where is the practice applicable. 2. Materialsrn2.1 Quality assurancern2.2 Quality controlrn3. Construction Requirementsrn3.1 Site preparationrn3.1 General installationrn3.3 Delivery, storage and handlingrn3.4 Inspectionrn3.5 Maintenancern3.6 Acceptance Criteriarn4. Method of Measurementrn5. Method of Payment.rnThe evaluation of the Standard Specifications included interviews with SCDOT construction staff, SCDOT construction inspectors, and other users of the Standard Specifications. The purpose of these interviews was to identify specific inadequacies of the existing Standard Specifications. The evaluation of the Standard Specifications also included correspondence with industry manufacturers to ensure that the Standard Specifications adequately reflect products and measures that are available for distribution.rnThe evaluation of the Standard Specifications included erosion prevention and sediment control site inspections on active SCDOT construction sites. The site inspections were conducted to evaluate the implementation and effectiveness of the Standard Specifications. The improved Standard Specifications will be presented in this technical paper.
机译:南卡罗来纳州运输部(SCDOT)于2004年实施了几项新的防腐蚀和沉积物控制补充规范。实施2年后,SCDOT决定应对这些补充规范以及其他现有规范进行评估,修改和完善。 .rn评估的标准规格类别包括防腐蚀,沉积物控制,雨水径流控制和施工后水质控制。对以下特定的标准规格进行了详细评估。粘结纤维基体(BFM),柔性生长基体(FGM),入口结构过滤器,沉淀管,稳定的施工入口,堆肥,结构后施工水质结构,淤泥围栏,临时稳定,临时播种和永久播种。对每个标准规范进行了以下类别的评估:rn1。说明rn1.1付款的计量单位rn1.2适用的惯例在哪里? 2.材料rn2.1质量保证rn2.2质量控制rn3。施工要求rn3.1现场准备rn3.1一般安装rn3.3交付,存储和处理rn3.4检验rn3.5维护rn3.6验收标准rn4。测量方法rn5。付款方式。对标准规范的评估包括与SCDOT施工人员,SCDOT施工检查员以及其他使用标准规范的用户进行的访谈。这些访谈的目的是确定现有标准规范的特定不足之处。对标准规范的评估还包括与行业制造商的通信,以确保标准规范充分反映可用于分发的产品和措施。对标准规范的评估包括对活动的SCDOT施工现场的防腐蚀和沉积物控制现场检查。进行了现场检查,以评估标准规范的实施和有效性。改进的标准规范将在本技术文件中介绍。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号