PILE DRIVING BETWEEN THE AMAZONAS AND XINGU RIVERS IN THE TUCURUI- MANAUS TRANSMISSION LINE - LESSONS LEARNED AND SOLUTIONS FOUND FOR CHALLENGING PROJECT

机译:在Tucurii-manaus传输线的亚马逊和Xingu河之间的桩驾驶 - 挑战项目的经验教训和解决方案

获取原文

摘要

Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the large Brazilian states of Amazonas, Amapa and Para to use the energy from hydroelectric plants, thus eliminating the need for the use of diesel fuel thermal plants, with their much larger environmental footprint. Due to its extraordinary characteristics, the Green Peace and the Discovery Channel constantly visited the job. The part between the Amazon and the Xingu rivers started in 2012, and encompassed about 100 transmission towers with up to 150 m height, through a region known as "Alagados". This region exhibits a 1.5 m water level during the rainy season, and soaked ground the rest of the year. Navigation of regular vessels is impossible during the flood season, when a dense vegetation called "bulhado" fills the riverbed, and vehicle traffic is impossible during the dry season, due to the extremely low surface soil resistance. Great logistical and technical difficulties were encountered for driving and determining the capacity of the piles. New systems had to be developed for driving the piles, with the simultaneous use of 15 small piling rigs. The final penetration, total number of hammer blows during driving, plus Dynamic and Static Load Tests were used for determining the driving and acceptance criteria.
机译:在2008年开始,这一1800公里长的电气传输线的项目是主要森林和河流的过度技术复杂性的工作。准备就绪后,它将允许大型巴西亚马逊,Amapa和Para使用来自水力发电的能量,从而消除了柴油燃料热植物的需要,具有更大的环境足迹。由于其非凡的特征,绿色和平与发现频道不断访问这项工作。亚马逊与Xingu河流之间的部分于2012年开始,包括大约100个传输塔,最多可达150米的高度,通过称为“Alagados”的区域。在雨季期间,该地区展示了1.5米的水位,并在今年剩下的时间里浸泡。在汛期期间,常规船舶的导航是不可能的,当叫做“Bulhado”填充河床的浓密植被时,在干燥的季节中不可能是不可能的,由于表面耐污垢极低。遇到巨大的后勤和技术困难,用于驾驶和确定桩的能力。必须开发用于驱动桩的新系统,同时使用15个小打桩钻井平台。最终穿透,驱动过程中的锤锤总数,以及动态和静态载荷测试用于确定驾驶和验收标准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号