首页> 外文会议>System Dynamics Society International Conference >Engineering Change Orders influencing manufacturing start-ups in the automobile industry
【24h】

Engineering Change Orders influencing manufacturing start-ups in the automobile industry

机译:影响汽车行业制造业初创企业的工程变更订单

获取原文

摘要

Many companies, especially in high tech industries, are facing shrinking product lifecycles and increasingly complex production and product technologies. These market dynamics pressure production facilities to begin full scale operations at a point when the underlying process technology is still poorly understood. Consequently companies suffer from substantial yield losses which can dramatically affect the economics of the product, the production facility, and business. The production ramp-up will be defined as the time span equal to the difference between 'time- to- market' and' time- to- volume'. A major goal of innovators is to reduce the 'time-to-market', however they cannot evaluate the effects on the 'time-to-volume' When production is started at a point of low series production readiness a lot of engineering changes are likely to be detected during the ramp-up phase. This paper will compare two policies for the management of changes during production ramp-up.
机译:许多公司,特别是在高科技产业,都面临着萎缩的产品生命周期和日益复杂的生产和产品技术。这些市场动态的压力生产设施在潜在的过程技术仍然清晰地理解时,在某一点开始全面运营。因此,公司遭受了大量产量损失,可以大大影响产品的经济性,生产设施和业务。生产升级将定义为等于“上市时间”与“时间 - 卷”之间的差异的时间范围。创新者的主要目标是减少“上市时间”,但是当生产开始时,他们无法评估对“储量的储量”的影响很多工程变更可能在斜坡阶段期间检测到。本文将比较两项政策,用于管理生产速度期间的变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号