首页> 外文会议>IEEE Particle Accelerator Conference >PHASE TROMBONE PROGRAM MIGRATION FOR THE RECYCLER RING AT FERMILAB
【24h】

PHASE TROMBONE PROGRAM MIGRATION FOR THE RECYCLER RING AT FERMILAB

机译:阶段长号程序迁移Fermilab的再循环戒指

获取原文

摘要

A best matching algorithm was found using a test program written in Mathematica, and was integrated into an accelerator control on-line program. This on-line program now gets rid of network communication, and does not need to run code MAD. In this report, we first describe the matching conditions, and 4 cases of constrains. Using a test program written in Mathematic, given a change of tunes, we were able to find the possible combination of the quadrupole strength in trombone section for each case. We then tested the calculation results by simulations using code MAD and by experiments on the Recycler ring. Finally we found the best matching algorithm and integrated it into an accelerator control on-line program. The test results for the setting and measured tune values by running on-line program on console are also presented.
机译:使用在Mathematica中编写的测试程序找到了最佳匹配算法,并集成到加速器控制在线程序中。此在线程序现在摆脱了网络通信,并且不需要运行代码。在本报告中,我们首先描述了匹配条件,4例约束。使用在数学中编写的测试程序,鉴于调整的变化,我们能够在每种情况下找到长轴部分中的四极强度的可能组合。然后,我们通过疯狂的仿真测试计算结果,并通过再循环圈上的实验进行模拟。最后,我们找到了最佳匹配算法,并将其集成到加速器控制在线程序中。还呈现了通过在控制台上运行在线程序的设置和测量调谐值的测试结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号