Stabilization of a BNSF embankment failure via displacement and surcharging

机译:通过位移和收费稳定BNSF堤防失败

获取原文

摘要

Between July of 2004 and November of 2006, Braun Intertec Corporation worked to stabilize an embankment failure along a BNSF railroad in Long Lake, Minnesota. The failure occurred as an existing embankment was being widened to accommodate a southerly track shift and a TH 12 bypass through the area. The failure impacted an approximate 500-foot section of embankment fill being advanced over a thick sequence of organic soils, and soft silts and clays. Given the depth of the failure mass, and because it was largely submerged, the chosen mitigation alternative consisted of displacement, followed by temporary surcharging to reduce the risk of long-term embankment deformation. The final embankment geometry was also altered to enhance long-term embankment stability. Inclinometer measurements taken during displacement and surcharging, and after surcharge removal, were critical to validating the success of the project. Nineteen months after surcharge removal, only negligible amounts of deformation have been recorded.
机译:2004年7月至2006年11月至2006年11月期间,布劳恩Intertec公司曾努力稳定明尼苏达州长湖的BNSF铁路的堤防失败。由于现有路堤发生的失败发生了扩大,以适应南部轨道换档和TH 12旁路通过该地区。失败影响了近似500英尺的堤防填充部分,其在厚的有机土壤中提出,柔软的淤泥和粘土。鉴于失效质量的深度,因为它在很大程度上浸没了,所选择的缓解替代方案包括位移,然后暂时收费,以降低长期路堤变形的风险。最终的路堤几何形状也被改变以提高长期路堤稳定性。在位移和收费期间采取的倾角仪测量以及额外收费后,对验证项目成功至关重要。额外收费后,额外收费后,只记录了忽略量的变形。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号