首页> 外文会议>IAHR Symposium on River, Coastal and Estuarine Morphodynamics >River incision due to gravel mining: a case study
【24h】

River incision due to gravel mining: a case study

机译:由于砾石采矿引起的河切切口:一个案例研究

获取原文
获取外文期刊封面目录资料

摘要

Historical information was used to study river degradation in a case study in NE Spain. The accumulation of good topographical information since the 1940s for the Gallego river (a tributary of the Ebro river, which drains about 4,000 km~2 of the southern slopes of the Pyrenees) enables a comparison of longitudinal bed profiles. Historical research has also revealed the volume of gravel mined, which amounts to ≈ 1 million m~3 compared to the volume of alluvium lost due to incision in the same period, which is ≈ 2 million m~3. This unbalance is explained by a simple model based on a bedload equation and an algorithm to determine whether effective bedload transport is controlled by transport capacity or by the supply of sediment. It follows from the analysis that the incision process has changed the magnitude of the shear stresses on the bottom. This is because, as the river becomes degraded, higher discharges fit into the main channel before spilling.
机译:历史信息用于研究河流退化,在网状西班牙的案例研究中。自20世纪40年代为Gallego River(eBro河的支流)自20世纪40年代以来积累了大约4,000公里〜2的比利牛斯的横坡,可以比较纵向床型材。历史研究还揭示了碎石的成矿量,其含量为≈1百万米〜3相比,由于同一时期由于切口而损失的血管体积,这是≈2百万米〜3。这种不平衡由基于床单方程的简单模型和算法来解释,以确定是否通过运输容量或沉积物来控制有效的床单运输。从分析中遵循切口过程改变了底部剪切应力的大小。这是因为,随着河流变得劣化,在溢出之前,较高的放电拟合到主通道中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号