首页> 外文会议>Asian International Workshop on Advanced Reliability Modeling >OPTIMUM PRODUCTION RUN LENGTH AND WARRANTY PERIOD SETTING FOR THE IMPERFECT PRODUCTION SYSTEM
【24h】

OPTIMUM PRODUCTION RUN LENGTH AND WARRANTY PERIOD SETTING FOR THE IMPERFECT PRODUCTION SYSTEM

机译:不完美生产系统的最佳生产运行长度和保修期设置

获取原文

摘要

Traditional economic manufacturing quantity (EMQ) model addressed that the perfectproduction for product. However, there possibly exists the defective product in the manufacturing process. Hence, it is necessary to consider the production process state in the modified EMQ model. Chen and Chung presented the quality selection problem to the imperfect production system for obtaining the optimum production run length and target level. Ladany and Shore proposed the problem of determining optimal warranty period of product in relation to the manufacturer's lower specification limit. In this paper, we further integrate Chen and Chung's and Ladany and Shore's models for obtaining the optimum production run length and warranty period of product for the imperfect production system.
机译:传统的经济制造数量(EMQ)模型解决了产品的PerfectProduction。然而,在制造过程中可能存在有缺陷的产品。因此,有必要考虑修改的EMQ模型中的生产过程状态。 Chen和Chung向不完美的生产系统提出了质量选择问题,以获得最佳生产运行长度和目标水平。 Ladany和Shore提出了关于制造商较低规格限制的最佳保修期的问题。在本文中,我们进一步融合了陈和钟和Ladany和Ladany和Shore的模型,以获得不完美生产系统的最佳生产运行长度和保修期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号