首页> 外文会议>International Symposium on Applications of Computers and Operations Research in the Mineral Industry >The connection between production schedule and cut-off optimization in underground mines
【24h】

The connection between production schedule and cut-off optimization in underground mines

机译:地下矿区生产计划与截止优化之间的联系

获取原文

摘要

While commercial systems are available for optimizing open cut design and production schedules, no similar system is available for underground mining. The opportunity for improving the economics of selective operations is especially attractive due to the complex interaction between the cut-off grade, mine plan and production schedule. No system is available that is capable of integrating all three strategic planning decisions within the context of life-of-mine optimization. The following discussion presents the history and state-of-the-art in cut-off grade theory and optimization with the conclusion that the accepted methods are inadequate when applied to selective underground mining. An alternative approach is presented, by way of an example, of scheduling copper production for a large sublevel stoping operation. The case study demonstrates that optimal cut-off policy is a consequence of production schedule optimization and that direct methods that treat cut-off as a decision variable may not be necessary or even desirable.
机译:虽然商业系统可用于优化开放式设计和生产计划,但没有类似的系统可用于地下挖掘。由于截止级,矿山计划和生产计划之间的复杂相互作用,改善选择性运营经济学的机会尤其吸引人。没有系统可用,能够在矿井终结范围内整合所有三项战略规划决策。以下讨论介绍了截止级理论的历史和最先进,结论是当应用于选择性地下采矿时所接受的方法不足。作为示例,通过调度铜生产来呈现替代方法,用于大的悬浮仪停止操作。案例研究表明,最佳的截止政策是生产计划优化的结果,并且可能不需要甚至希望处理截止作为决策变量的直接方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号