...
首页> 外文期刊>Resources policy >Determination of the optimum cut-off grades and production scheduling in multi-product open pit mines using imperialist competitive algorithm (ICA)
【24h】

Determination of the optimum cut-off grades and production scheduling in multi-product open pit mines using imperialist competitive algorithm (ICA)

机译:帝国主义竞争算法(ICA)测定多产品露天矿区的最佳截止等级和生产调度

获取原文
获取原文并翻译 | 示例
           

摘要

With regard to the immense importance of cut-off grade in designing and planning open pit mines, optimizing this parameter has considerable effects in mining economic. This paper describes objective function for single metal mines with multi-product. For this purpose, the operation process in mine No.1 of the Golgohar iron mine that produces three types of products (sizing, concentrate and pellet) for sales is used to model objective function. Then the Imperialist Competitive Algorithm (ICA) has been utilized to find out the optimum cut-off grades. Consequently, the optimum cut-off grades has been calculated between 40.5 and 47.5% and net present value has been obtained 18,142 billion Rial. In addition, production scheduling is carried out for five years mining plan pushback. Therefore, the average stripping ratio has been determined 1.41. The result shows that by stockpiling low-grade ore, concentrate plant can be fed by maximum capacity for one year addition to the primary plan.
机译:关于在设计和规划露天矿井方面截止级别的巨大重要性,优化该参数在矿业经济方面具有相当大的效果。 本文介绍了单一金属矿的客观函数,具有多产品。 为此目的,Golgohar Iron Mine的矿井1号的操作过程用于销售三种产品(施胶,浓缩物和颗粒)的销售,用于模拟客观函数。 然后,帝国主义竞争算法(ICA)已被利用来找出最佳截止等级。 因此,最佳截止等级已经计算在40.5至47.5%之间,并获得了181.142亿卢比的净目的价值。 此外,生产调度为五年的矿业计划推送。 因此,已经确定了平均汽提比1.41。 结果表明,通过储存低级矿石,浓缩植物可以通过最大容量进给一年的主要计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号