首页> 外文会议>International Conference on Automated People Movers >DFW APM - Innovative Solutions to Success
【24h】

DFW APM - Innovative Solutions to Success

机译:DFW APM - 成功的创新解决方案

获取原文

摘要

DFW International Airport has a USD2.7 Billion Capital Development Program underway that will literally transform one of the world's five busiest airports into an efficient, service oriented, transportation business while providing its travelers a world-class experience. This program has been implemented over a five-year period and includes an USD847 million Automated People Mover (APM) system that went online in February 2005. The APM includes almost five miles of bi-directional track, carries over 5000 passengers an hour, per direction, and is built an average of fifty feet above the apron spanning over operating aircraft. The APM services all five of DFW's existing terminals and future sixth terminal in less than eight minutes and is the focal point in re-imaging and re-vitalizing the airport. There were great rewards on this fast track design and construction project that used a unique delivery process to bring owner, airlines, tenants, design consultant, construction contractor, and APM system supplier together as one team to meet the rigorous 23-month design and overlapping 38-month construction schedule. This paper addresses this unique project delivery method as well as the challenges in spanning over operating aircraft, while limiting interruptions to those operations, and the innovative guideway design that greatly reduced construction time on the airport's operating ramp. Included, are discussions of design and construction issues and constraints that lead to incorporating imaginative engineering processes that supported the contractor in meeting the schedule. Design techniques are illustrated that allowed around the clock progress while having severely limited access time to the ramp operations area for construction. In conclusion, this paper shows how a unique delivery process, coupled with innovative design techniques, has lead to the successful installation of DFW's Skylink Automated People Mover.
机译:DFW国际机场有27亿美元的资本开发方案,这将在实际上将全球五个最繁忙的机场成为一个高效,服务导向的交通业务,同时提供旅行者的世界级经验。该计划已在五年内实施,包括2005年2月在线上网的8470万美元的自动化人员搬家系统(APM)系统。APM包括近五英里的双向轨道,每辆乘客超过5000英里方向,在围裙上方建造了50英尺,跨越经营飞机。 APM服务所有5个DFW现有的终端和未来六码在不到八分钟内,是重新成像和重新振兴机场的焦点。在这种快速的轨道设计和建筑项目中有很大的奖励,这些项目使用独特的交付过程,将所有者,航空公司,租户,设计顾问,建筑承包商和APM系统供应商作为一个团队,以满足严格的23个月设计和重叠38个月的施工时间表。本文涉及这种独特的项目交付方法以及跨越经营飞机的挑战,同时限制对这些操作的中断,以及创新的导轨设计,大大减少了机场运行坡道的施工时间。包括在讨论设计和施工问题和限制,导致纳入富有想象力的工程流程,这些过程支持承包商在举行时间表。示出了设计技术,其围绕时钟进度允许,同时对斜坡操作区域具有严重限制的访问时间以进行结构。总之,本文显示了如何与创新设计技术相结合的独特交付过程,导致DFW的Skylink自动化人员的成功安装。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号