首页> 外文会议>World of Coal Ash Conference >So, You’ve Built a Landfill for Your Ash Pond Closure, Now What? (Lessons Learned During CCR Landfill Operations)
【24h】

So, You’ve Built a Landfill for Your Ash Pond Closure, Now What? (Lessons Learned During CCR Landfill Operations)

机译:那么,你为你的灰池封装建造了垃圾填埋场,现在是什么? (在CCR垃圾填埋行动期间的经验教训)

获取原文

摘要

Coal Combustion Residual (CCR) landfills constructed to store CCRs from an ash basin closure (closure landfill) have different operational considerations than CCR landfills constructed to store CCRs generated during active power production (generation landfill). Most notably, closure landfills accept wetter ash at a faster disposal rate than generation landfills. Critical Best Management Practices for operating closure landfills include exterior sideslope grade control, interim cover placement methods, Run-On and Run-Off Control Plan compliance, managing contact water at the operational face, moisture control and conditioning, and engineering and construction quality assurance (CQA) oversight. The best management practices benefit the landfill owner by maximizing airspace utilization, reducing risk of exterior sideslope re-work, and reducing the risk of an environmental release.
机译:煤燃烧残余(CCR)垃圾填埋场从灰盆地封闭(封闭垃圾填埋场)储存CCR的垃圾填埋场具有比构建在有效电力生产(发电垃圾填埋场)所产生的CCR的CCR垃圾填埋场的不同操作考虑因素。最值得注意的是,关闭垃圾填埋场比生物填埋场更快的处置率接受湿灰。操作封闭垃圾填埋场的关键最佳管理实践包括外部SideLope等级控制,临时覆盖放置方法,运行和耗尽控制计划合规性,在操作面部,防潮控制和调节以及工程和施工质量保证,管理接触水( CQA)监督。最佳管理实践通过最大化空域利用率,降低外部侧面落实的风险,降低环境释放的风险,使垃圾填埋层拥有。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号