首页> 外文会议>the Annual Conference on Explosives and Blasting Technique >CONTINUING IMPROVEMENTS IN LONGHOLE STOPING AT THE BULYANHULU MINE
【24h】

CONTINUING IMPROVEMENTS IN LONGHOLE STOPING AT THE BULYANHULU MINE

机译:在佛罗萨乌州矿山停止长孔的持续改进

获取原文

摘要

The Bulyanhulu Mine,Tanzania is constantly trialing ideas for improvements in the drill and blast process.The project work has resulted in a large number of choices in explosive type and charging methods being available for blast design.Interestingly,though booster sensitive bulk emulsion had been introduced to the site to reduce dilution,better results were being obtained from reduced charge columns (decoupled columns of poured anfo in 50mm pvc pipe) and pneumatically loaded anfo upholes,which had been traced.In order to compare the explosive type and charge up-methods,an explosives comparison trial was performed.
机译:坦桑尼亚的百日洲豪鲁矿不断分担钻探和爆炸过程的改进思路。项目工作导致了大量的爆炸式选择和充电方法,可用于爆炸设计。虽然增强敏感散装乳液引入现场以减少稀释,从减少的电荷柱(50mm PVC管道上的倒入的ANFO柱的分离柱)和气动加载的ANFO垫座上获得了更好的结果,这已经进行了追踪。为了比较爆炸类型并充电 - 方法,进行炸药对比试验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号