首页> 外文会议>World tunnel congress >Construction of Shaft Tunnel by Slurry Pipe Jacking through Sedimentary Ground under High Water Pressure
【24h】

Construction of Shaft Tunnel by Slurry Pipe Jacking through Sedimentary Ground under High Water Pressure

机译:高水压下沉积地面泥浆隧道施工轴隧道

获取原文
获取外文期刊封面目录资料

摘要

A shaft tunnel driven by pipe jacking was adopted in order to provide ventilation to the underground reservoir tunnel under the national highway in Yokohama, Japan. Downward excavation of the 2000mm ID ventilation tunnel starts from ground surface and reaches to the crown of the existing reservoir tunnel, which is located 87.8m deep. Depression angle of the tunnel is set as 75.6 degree. Pore water pressure at the arrival is 0.66MPa. This project is one of the largest in this type of tunnels in Japan. As Oogihara et al. (2003) described on details of the shield machine, this paper focuses on equipment and facilities adopted in the project and construction methodology of the inclined pipe jacking.
机译:采用由管道顶部驱动的轴隧道,以便为日本横滨国家公路下的地下水库隧道提供通风。向下挖掘2000mm ID通风隧道从地面开始,到达现有水库隧道的冠部,位于87.8米。隧道的抑郁角设定为75.6度。到达时的孔隙水压是0.66MPa。该项目是日本这类隧道中最大的项目之一。作为oogihara等。 (2003)描述了屏蔽机的细节,本文重点介绍了倾斜管道的项目和施工方法中采用的设备和设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号