RESTORATION DESIGN OF COLDWATER FORK FOLLOWING THE OCTOBER 11, 2000 SLURRY SPILL

机译:2000年10月11日泥浆泄漏后冷水叉的恢复设计

获取原文

摘要

On Wednesday morning, October 11, 2000, a breach in the 72-acre Big Branch slurry impoundment caused the release of approximately 250 million gallons of coal slurry, a substance consisting of coal fines, other particles and water, into the Coldwater Fork and Wolf Creek Watersheds, through two mine portals ultimately affecting more than 100 miles of stream. Arguably, the most severly impacted section of stream was Coldwater Fork downstream of the portal. During the cleanups, approximately one mile of Coldwater Fork was relocated, resulting in an incised trapezoidal channel over much of the stream. While portions of the stream, particularly sections with good floodplain access, have recovered, other reaches are characterized by headcuts and a lack of riffle-pool sequences. Working for the Martin County Coal Corporation (MCCC), Fuller, Mossbarger, Scott and May, Inc. (FMSM) performed an assessment of the Upper Middle Fork of Coldwater Fork, and prepared a design and directed construction for nearly 6,000 feet of stream restoration.
机译:2000年10月11日星期三,在72英亩的大分支浆料蓄水中违反了释放约2.5亿加仑的煤浆,一种物质组成的煤炭,其他颗粒和水,进入冷水叉和狼Creek流域,通过两个矿山门户,最终影响超过100英里的溪流。可以说,最严重影响的流部分是门户下游的冷水叉。在清洁过程中,大约一英里的冷水叉被重新定位,导致在大部分流中切开的梯形通道。虽然流的部分,特别是具有良好洪泛平台的部分,但是,其他达到的其他达到的是头脑的特征和缺乏Riffle池序列。为Martin County Coal Corporation(MCCC),Fuler,Mossbarger,Scott和May,Inc。(FMSM)进行了评估,对冷水叉的上部叉进行了评估,并为近6000英尺的流恢复制定了设计和定向施工。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号