首页> 外文会议>Workshop on Geothermal Reservoir Engineering >Integration of Environmental Management System in Monitoring of Environmental and Social Aspects Associated with Operation of Olkaria II Geothermal Power Plant in Naivasha Sub-county, Nakuru County, Kenya
【24h】

Integration of Environmental Management System in Monitoring of Environmental and Social Aspects Associated with Operation of Olkaria II Geothermal Power Plant in Naivasha Sub-county, Nakuru County, Kenya

机译:肯尼亚纳库鲁县纳瓦莎亚县奥克里亚二世地热发电厂环境管理体系对环境管理体系监测的环境管理体系

获取原文

摘要

Environmental Impact Assessment (EIA) is a legal requirement in Kenya as provided for by Environmental Management and Coordination Act (EMCA) 1999. Besides ensuring compliance with the law, Kenya Electricity Generating Company (KenGen) Ltd treats EIA as a tool to anticipate, manage and respond to environmental, social and health risks. The management actions arising from EIAs are usually defined and translated into an Environmental Management Plan (EMP) for the design, construction, operation and/or decommissioning phases of a project. To ensure a better understanding of cause effect relationships between the project and its environment and to improve EIA predictions and mitigation methods, environmental monitoring is necessary. KenGen has integrated the International Standards Organization (ISO 14001:2004) Environmental Management System (EMS) in the management and monitoring of environmental and social aspects associated with its operations. This has positioned the company as an environmentally responsible corporate citizen thus enhancing its corporate image as well as building trust with the local community. KenGen currently generates 430MWe of geothermal energy from four conventional power plants namely: Olkaria I, Olkaria I additional units, Olkaria II and Olkaria IV. Olkaria II power plant has a total installed capacity of 105MWe from three generator units each rated at 35 MWe. This paper seeks to highlight how monitoring of environmental and social aspects associated with the operation of Olkaria II power plant is undertaken by KenGen. Emphasis has been placed on how integration of ISO 14001:2004 into environmental monitoring has been achieved.
机译:环境影响评估(EIA)是肯尼亚的法律要求,由环境管理和协调法案(EMCA)1999年提供。除了确保遵守法律外,肯尼亚电力发电公司(Kengen)Ltd将EIA视为预期,管理的工具并回应环境,社会和健康风险。来自EIS产生的管理行动通常定义和转化为项目的环境管理计划(EMP),了解项目的设计,建设,运营和/或退役阶段。为了确保更好地了解项目与环境之间的原因关系,并提高环境影响评估预测和缓解方法,是必要的环境监测。 Kengen在管理和监督与其运营相关的环境和社会方面的管理和监控方面,凯恩综合了国际标准组织(ISO 14001:2004)的环境管理体系(EMS)。这使该公司成为环保公司公民,从而加强其企业形象,以及与当地社区的建立信任。 Kengen目前从四种传统发电厂产生430mme的地热能即:奥尔卡里亚,奥尔卡里亚我额外的单位,奥尔巴里亚II和奥尔巴拉亚IV。 OLKARIA II电厂的总装机容量为105米,从三个发电机单元均为35 MWE。本文探讨了Kengen突出了如何监测与Olkaria II电厂运营相关的环境和社会方面。重点是ISO 14001:2004如何实现环境监测的一体化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号