首页> 外文会议>Workshop on Geothermal Reservoir Engineering >THE CURRENT STATUS OF GEOTHERMAL PROJECTS IN AUSTRALIA - A NATIONAL REVIEW
【24h】

THE CURRENT STATUS OF GEOTHERMAL PROJECTS IN AUSTRALIA - A NATIONAL REVIEW

机译:澳大利亚地热项目现状 - 全国评论

获取原文

摘要

Australia has large geothermal energy potential; however the use of geothermal energy is a relatively new technology to Australia and requires successful technical and commercial demonstration before gaining widespread acceptance. Australia's current geothermal projects are focused on developing both Engineered Geothermal System (EGS) and Hot Sedimentary Aquifer (HSA) plays to generate electricity, power large scale air conditioning and industrial-scale direct use applications. At this point the Australian geothermal industry remains largely at a pre-competitive exploration stage. The high expectations of the sector have been tempered in the last 18 - 24 months by the impact of the Global Financial Crisis (GFC) broadly reducing equity investment in projects that have multiple, technical risks. Difficulty in accessing capital for projects in the current market has slowed the sectors' anticipated progress and hampered access to more than Au $296 million (~US$311 million) in allocated Australian Commonwealth and State government grants, which include a matching funding component, although equity markets continued their support of the geothermal sector by participating in individual companies' capital raisings. Rather than a large-scale retraction however, the trend has been for the companies to re-negotiate their work programs and try to minimise their capital outlay while continuing to hold onto their licences, plan for future work activities, and vigorously seek additional funding for this future work. Currently 56 companies hold 361 exploration licences distributed across the nation covering over 441,000 square kilometres. In the 9 year term 2002 - 2011, more than Au$750 million (~US$787 million) has been spent on studies, geophysical surveys, drilling, reservoir stimulation and flow tests which comprise the work programs required to sustain tenure in geothermal license areas. The. Australian Government has been working with companies to assist the progress of projects and has recently implemented substantial changes to Commonwealth policy on renewable energy and climate change over the last 12 months culminating in the introduction of a comprehensive series of policy initiatives. These include the introduction of a carbon price, expansion of the National Renewable Energy Target, promoting innovation and investment in renewable energy, encouraging energy efficiency and the establishment of two new funding bodies which will be key to the emergence of the Renewable Energy Sector generally and geothermal energy specifically. This paper summarises: (1) policies and programs put in place to support the development of the geothermal sector; and (2) a synopsis of progress of key geothermal projects in Australia.
机译:澳大利亚具有大型地热能源潜力;然而,在获得广泛的接受之前,使用地热能量的使用是一种相对较新的技术,并且需要成功的技术和商业示范。澳大利亚目前的地热项目专注于开发工程化地热系统(EGS)和热沉积含水层(HSA)发挥电力,电力大规模空调和工业规模直接应用应用。此时,澳大利亚地热行业主要依赖于竞争前的勘探阶段。通过全球金融危机(GFC)的影响,该部门对该部门的高期望已经在过去18 - 24个月内遭受了繁多的影响,这些金融危机(GFC)大概减少了具有多种技术风险的项目的股权投资。在当前市场的项目中访问资本的难度放缓,这些部门的预期进展和阻碍了超过296,000,000澳元(〜3.11亿美元),虽然股权市场继续通过参加个人公司的资本筹款继续支持地热部门。然而,这一趋势已经为公司重新谈判工作计划而不是大规模收缩,并试图尽量减少他们的资本支出,同时继续持有其许可证,计划未来的工作活动,并大力寻求额外的资金这个未来的工作。目前,56家公司持有361家勘探许可证,分布在全国范围内超过441,000平方公里。在2002年至2011年的9年期间,已经花费了超过7.5亿美元(〜7.87亿美元)的研究,地球物理调查,钻井,水库刺激和流量试验,包括在地热牌照区域维持任期所需的工作计划。这。澳大利亚政府一直与公司合作,协助项目的进步,并在过去12个月内,在过去的12个月内,最近对可再生能源和气候变化进行了大量变化,最终导致了一系列全面的一系列政策举措。这些包括引入碳价格,扩大全国可再生能源目标,促进创新和投资可再生能源,鼓励能源效率和建立两个新的融资机构,这将是可再生能源部门的出现的关键地热能具体。本文总结了:(1)制定的政策和计划支持地热部门的发展; (2)澳大利亚重点地热项目的进展概要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号