CHALLENGES IN DEVELOPING KATWE GEOTHERMAL POWER PROJECT IN KIKORONGO-BUNYAMPAKA, KASESE DISTRICT, WESTERN UGANDA

机译:在乌干达西部Kasese区Katwe-Bunyampaka开发Katwe地热电工程的挑战

获取原文

摘要

Exploration for geothermal energy in Uganda has progressed to a level of attracting independent power producers' investment in line with Uganda's fully liberalized energy in addition to Government of Uganda Overall Policy of increasing the use of modern renewable energy, from the current 4% to 61% of the total energy consumption by the year 2017. Messrs. Katwe Geothermal Power Project Limited is one of the developers granted a concession in Katwe Kikorongo- Bunyampaka geothermal field. According to exploration work carried out by the Department of Geological Survey and Mines indicate that the geothermal activity in the four areas is related to the volcanic and tectonic activities of the Rift Valley, which has a higher heat flow than the surrounding Precambrian crust. Subsurface temperatures of approximately 140-200°C for Katwe, has been predicted by geothermometry and mixing models. Anomalous area has been delineated in Katwe prospect using geophysical methods. The geology, geochemistry, hydrology and geophysics studies together with the drilling of shallow boreholes to a depth of 200-300m for temperature gradient measurement has been completed and the temperatures measured (30-36°C/km) are slightly above the global average of 30°C/km, which suggests deep reservoirs in Katwe area. The Katwe Geothermal Project estimated at 100 - 200 Mega Watts, will be developed as a turnkey project in partnership with an American Investor on finance, design, build, operate and transfer basis employing a venture capital of approximately United States dollars one billon. The project encountered a myriad of challenges that have affected the completion of surface surveys, environment impact assessment and drilling of three test wells, greatly affecting the completion of this phase that was slated for September, 2013.
机译:乌干达地热能探索已经进展到乌干达的完全自由化能源除了乌干达政府增加现代可再生能源的整体政策外,乌干达的投资普遍存在乌干达的全面自由化能源的水平,从目前的4%到61% 2017年全年能源消费量。Messrs。Katwe GeoThermal Power Project Limited是在Katwe Kikorongo-Bunyampaka地热场授予特许权的开发人员之一。根据地质调查和地雷部门进行的勘探工作表明,四个地区的地热活动与裂谷的火山和构造活动有关,其热流比周围的先锋前锋。地下电影压仪表,地下水化和混合模型预测了大约140-200°C的地下温度。使用地球物理方法在KATWE展望中划定了异常区域。完成地质,地球化学,水文和地球物理学研究与浅钻孔钻到200-300M的温度梯度测量的深度,测得的温度(30-36°C / km)略高于全球平均值30°C / km,这表明凯尔威地区的深层水库。 Katwe地热项目估计为100-200兆瓦瓦,将作为与美国投资者合作的交钥匙工程,与美国投资者在金融,设计,建造,经营和转让基础上,雇用大约美国美元的风险投资1美元。该项目遇到了影响表面调查,环境影响评估和三次考试井的钻井的完成的无数挑战,大大影响了2013年9月的此阶段的完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号