DESIGN CONSTRUCTION OF A STORAGE FACILITY FOR INTERMEDIATE LEVEL WASTE AT HUNTERSTON A DECOMMISSIONING SITE

机译:在Hunterston停留退役网站的中间垃圾储存设施的设计与建设

获取原文

摘要

Hunterston A Decommissioning Site (UK) is required to process and store on site, both operational and decommissioning raw Intermediate Level Waste (ILW), encapsulated within some 1578 packages, until such time as a National Repository becomes available. These will be standard NIREX specification stainless steel 3m{sup}3 boxes and drums, containing the solid, sludge and resin wastes in a monolithic matrix of cementitious grout. The boxes will be used for solids and the drums for sludges and resins. The wastes are thus stabilised and passively immobilised in the packages, which are largely unshielded. The store comprises a single vault, above ground, concrete structure serviced by a Package Handling Machine (PHM) and designed for an operating life in excess of 100 years with minimal through life maintenance. The store structures provide the necessary public and operator shielding protection. Packaging of the wastes is the responsibility of separate projects, as is transport from these facilities to the store. The latter is by a proprietary transporter fitted with a top loading shielded container. The store design is intended as a generic solution suitable, with only minor modifications, for ILW storage on all Magnox reactor sites, and other possible applications. The paper describes the development of the design from the concept design to a fully substantiated design with an approved Pre Construction Safety Report and illustrates some of the more significant issues, which evolved, and the nature of their resolution. The project delivery is undertaken by the ILW Store Alliance which consists of Balfour Beatty (civil engineering construction), British Nuclear Group (management, design authority and safety), Weir Strachan and Henshaw (plant design, manufacture, installation and commissioning) and Halcrow (civil and structural design). The paper outlines the operation of the ILW Store Alliance, the programme of works, detailst he manufacturing, assembly and installation processes along with the civil construction sequence. Site preparation and construction commenced during 2004, with mass concrete in-fill up to the building base slab level being completed. Building construction is now well advanced, with LT rail installation ongoing. The Mechanical and Electrical equipment manufacture/procurement is well underway with major items such as receipt and inspection cells, PHM and MASD systems complete and HVAC & control room plant procurement ongoing. The next milestone safety submission will be the PICR, prior to inactive commissioning, programmed for completion in late 2006. Hand-over of the store to Site is scheduled for mid 2007.
机译:亨特斯顿退役网站(UK)需要处理和存储的网站,运营和退役原料中放废物(ILW),一些1578个封装中封装,直至为国家储备库变为可用。这些都将是标准规范NIREX不锈钢3米{SUP} 3盒和鼓,含有水泥灌浆的单片矩阵的固体,污泥和树脂废物。该盒将被用于固体和鼓为污泥和树脂。因此,废物被稳定地和被动地固定在包,这在很大程度上是屏蔽。储存器包括一个单一的拱顶,地上,混凝土结构由封装处理机器(PHM)服务,并且设计用于工作寿命超过100年的寿命通过维护最少。该店结构提供必要的公共和运营商屏蔽保护。废物的包装是单独项目的责任,从这些设施到商店的运输。后者是由配有顶部装载一个专有的转运屏蔽容器。店面设计旨在作为合适的一个通用的解决方案,只有轻微的修饰,在所有反应器镁诺克斯站点ILW存储,以及其它可能的应用。本文介绍了从概念设计的设计开发,以经批准的建设前安全报告充分证实的设计和说明一些比较显著的问题,而演变,及其解决方案的性质。该项目交付由ILW商店联盟其中包括保富(土建施工),英国核集团(管理,设计权威性和安全性),威尔Strachan和亨肖(厂设计,制造,安装和调试)以及合乐的(承诺土木及结构设计)。本文概述了ILW商店联盟,作品的程序的操作,detailst他制造,组装和安装过程与民用建筑序列一起。场地准备和建设2004年开始,与大体积混凝土在填充到筑基期水平板正在完成。建筑施工,现在工作进展顺利,与LT导轨安装正在进行中。机械和电气设备制造/采购正在有条不紊地进行与主要项目,如收货和验货细胞,PHM和MASD系统的完整和HVAC&控制室工厂采购正在进行中。下一个里程碑安全的提交将成为PICR,不活动的调试,编程完成之前,在2006年下半年的移交商店网站计划于2007年年中的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号