首页> 外文会议>NACE annual conference exposition >USAGE OF GPM-PORTABLE EQUIPMENT FOR DETERMINATION OF CORROSION STAGE OF CONCRETE STRUCTURES
【24h】

USAGE OF GPM-PORTABLE EQUIPMENT FOR DETERMINATION OF CORROSION STAGE OF CONCRETE STRUCTURES

机译:GPM便携式设备测定混凝土结构腐蚀阶段的用途

获取原文

摘要

During a Brite/Euram Project several European partners developed and produced an integrated monitoring system. So the inspection and maintenance costs and the traffic impairments can be reduced. One part of this project was concerned with evaluation of portable techniques for evaluation of reinforcement corrosion. During this work a newly developed, hand held, easily to handle, portable equipment based on the galvanostatic pulse method (GPM) was developed. This paper deals with the results and analysis of the GPM measurements performed on a highway- bridge exposed to de-icing salts as well as the results of laboratory tests. Results of average corrosion rates determined by weight loss and galvanostatic pulse technique were compared. Special attention was paid on the comparability of instrument readings to real behavior. Finally the necessary precautions which need to be taken when the on site data are used for life prediction of structures are discussed.
机译:在Brite / EURAM项目期间,几个欧洲合作伙伴开发并制作了一个集成的监控系统。因此,可以减少检查和维护成本和交通障碍。该项目的一部分涉及评估便携式技术评估腐蚀的技术。在此工作期间,开发了一种新开发的,手工举行,轻松处理,基于Galvanostatic脉冲方法(GPM)的便携式设备。本文涉及在暴露于去冰盐的高速公路和实验室测试结果上进行的结果和分析。比较了减肥和渗透脉冲技术确定的平均腐蚀速率的结果。特别关注仪器读物对真实行为的可比性。最后,讨论了在现场数据用于终身预测时需要采取的必要预防措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号