首页> 外文会议>New Zealand geothermal workshop >GEOTHERMAL DEVELOPMENT AT LIHIR ISLAND, PAPUA NEW GUINEA
【24h】

GEOTHERMAL DEVELOPMENT AT LIHIR ISLAND, PAPUA NEW GUINEA

机译:巴布亚新几内亚利哈尔岛地热发展

获取原文

摘要

Geothermal power development at Lihir Island in PNG has posed some unusual challenges. These arise from the geothermal resource, the mining environment and from the isolated location. The mining and geothermal infrastructure are both confined within the Luise caldera, a gravity collapse structure on the northeastern coast of Lihir Island. The original purpose of geothermal wells was to assist the mining operations by depressurising and cooling parts of the geothermal resource ahead of mining operations. The potential to harness at least some of the local geothermal energy has always been recognised and when the first deep production wells had been drilled and tested, a feasibility study was made to examine the technical feasibility of small sale geothermal power generation. A 6MW backpressure plant was approved in June 2002 and commissioned in May 2003. As drilling and testing new wells proceeded the geothermal potential was revised and a further 30MW geothermal generation project was approved in June 2003 for commissioning early in 2005.
机译:PNG Lihir Island的地热力发展构成了一些不寻常的挑战。这些来自地热资源,采矿环境和孤立地点。采矿和地热基础设施仅限于Luise Caldera,Lihir岛东北海岸的重力塌陷结构。地热井的原始目的是通过在采矿业务前提前的地热资源减压和冷却部分来协助采矿业务。在钻探和测试第一家深度生产井时,利用至少一些当地地热能量的潜力始终被认可,并进行可行性研究,以研究小销售地热发电的技术可行性。 2002年6月批准了6MW背压厂,并于2003年5月委托。由于钻井和测试新井进行了修订地热潜力,并于2003年6月批准了30MW地热生成项目,于2005年初进行调试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号