首页> 外文学位 >Management of Geohazards at Lihir Gold Mine Papua New Guinea.
【24h】

Management of Geohazards at Lihir Gold Mine Papua New Guinea.

机译:Lihir金矿巴布亚新几内亚的地质灾害管理。

获取原文
获取原文并翻译 | 示例

摘要

Lihir Gold Mine in Papua New Guinea is one of the largest gold mines in the world situated in a seismically sensitive zone. The gold deposit is located in an extinct volcano in close proximity to the sea shore and presents a series of geohazards. Some geohazards are uncommon and include: geothermal outbursts, cavities, water inrush and earthquake/tsunami. After a major multi-batter (5 benches high) slope failure that occurred on the 1st of October 2009, a team of engineers, lead by the author investigated the incident and made series of recommendations. Arising out of these recommendations, a comprehensive Geohazard Management Plan was formulated by revisiting, revising and putting together all the individual geohazard management plans as a single document.;This thesis describes the outcomes of the investigation and presents an overview and systematic approach in formulation of the Geohazard Management Plan, apart from a summary of the gaps that were identified in the existing system, major contributions that were made as well as the expected improvements and constraints in managing these geohazards.
机译:巴布亚新几内亚的利希尔金矿是世界上最大的金矿之一,位于地震敏感区。金矿位于靠近海岸的一座死火山中,并带来一系列地质灾害。一些地质灾害并不常见,包括:地热爆发,空洞,突水和地震/海啸。在2009年10月1日发生了一次大型的多电池斜坡(5个台阶)后,由作者领导的一组工程师调查了这一事件,并提出了一系列建议。在这些建议的基础上,通过将所有单独的地质灾害管理计划重新审视,修订并汇总为一个单独的文件,制定了全面的《地质灾害管理计划》。本论文描述了调查的结果,并提出了概述和系统化的地质灾害管理计划。 《地质灾害管理计划》,除了总结现有系统中发现的空白外,还做出了重大贡献以及在管理这些地质灾害方面的预期改进和制约因素。

著录项

  • 作者

    Singh, Mohan.;

  • 作者单位

    University of Alberta (Canada).;

  • 授予单位 University of Alberta (Canada).;
  • 学科 Engineering Mining.
  • 学位 M.S.
  • 年度 2010
  • 页码 104 p.
  • 总页数 104
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 老年病学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号