PT Arutmin Indonesia Satui Mine, South Kalimantan, Indonesia.

机译:Pt Arutmin Indonesia Onei Line,南卡里马丹,印度尼西亚。

获取原文

摘要

During the mining activity, major failure occurred in lowwall side of this pit. The dimension of the failure covered almost three blocks, which was from Block 28 to Block 30. The main haulage road which was located on the top of this lowwall also suffered failure. The road was being used as way for hauling the coal from northern mine site to the stock pile area in Muara Port. In order to avoid the halt of the mining activity due to this failure, the new hauling road diversion was constructed. The new road diversion was just located near to the old one on top of the lowwall. So it is important that a geotechnical study has to be conducted to guarantee the stability of the lowwall. The investigation result reveals that this plane failure was triggered by fault appered on top of the lowwall and slipped along the bedding plane. The slope stability analysis was carried out by back analysis to obtain the property of sliding material. The result then was used for analyzing the design of new lowwall slope, considering the load due to coal transportation road above.
机译:在采矿活动期间,这种坑的低墙侧发生重大失败。故障的维度涉及几乎三个块,这是从框28到块30.位于这种低坑座顶部的主要牵引道路也受到了破坏。这条路被用作从北部矿场搬运煤炭到Muara港口的煤炭地区的方式。为了避免由于这种故障而停止采矿活动,建造了新的牵引道路转移。新的道路转移距离旧的旧路转移位于旧的墙上。因此,必须进行岩土学研究,以保证低墙的稳定性。调查结果表明,该平面故障被低墙顶部的故障触发,并沿床上用品滑动。通过回分析进行斜坡稳定性分析,以获得滑动材料的性质。然后,结果用于分析新的LowWall斜率的设计,考虑到上面的煤炭运输道路的负荷。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号