首页> 外文会议>International Symposium on Mine Planning and Equipment Selection >Impact of ice ring formation on the ground water due to cooling-down around an underground LNG pilot storage cavern
【24h】

Impact of ice ring formation on the ground water due to cooling-down around an underground LNG pilot storage cavern

机译:冰环形成对地下水的影响,由于地下LNG先导洞穴周围的冷却

获取原文
获取外文期刊封面目录资料

摘要

To provide a safer and cost effective solution, a new concept of storing LNG in a lined rock cavern with containment system had been developed by Geostock, SKEC and SN Technigaz with the help of KIGAM(Amantini et al. 2004, Chung et al. 2004). To demonstrate the feasibility of this concept and to validate the numerical models, a cryogenic pilot cavern hadbeen designed, constructed and operated at KIGAM in the Daejeon Science Complex. This paper describes the results of the numerical modeling performed to investigate the impact of ice ring formation and propagation on the ground water flow, where the ice ring is created by the change of groundwater due to the cooling-down in the rock mass around the cavern.
机译:为了提供更安全和成本效益的解决方案,在KIGAM的帮助下,GeoStock,Skec和Sn Technigaz开发了一种带有遏制系统的衬里岩洞岩洞的LNG储存LNG的新概念(Amantini等,2004年,Chung等人。2004 )。为了展示这一概念的可行性和验证数值模型,在大道科学复合体的KIGAM设计,建造和运营的低温试验洞穴。本文介绍了对研究冰环形成和传播对地下水流动的影响的数值建模的结果,其中冰环由于洞穴周围的岩石质量的冷却而导致地下水的变化产生。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号