首页> 外文会议>International conference on wind engineering >Wind Tunnel Test Method to Study Out-of-Service Tower Crane Behaviour in Storm Winds
【24h】

Wind Tunnel Test Method to Study Out-of-Service Tower Crane Behaviour in Storm Winds

机译:风洞试验方法研究风暴风中的使用塔式起重机行为

获取原文

摘要

An experimental method used to study the behavior of tower cranes in strong winds exposed to the disturbed shear flow induced by the surrounding built environment is proposed. Wind tunnel tests on a tower crane model are described, the tower crane is considered as a rigid body slender structure equipped with a single degree of freedom part: the crane mobile jib allowing rotation with respect to the vertical axis. Geometrical and mechanical properties are simulated in order to reproduce realistic slewing part behavior. Instantaneous base overturning moments and slewing part positions are measured in a boundary layer wind tunnel able to simulate the turbulent wind characteristics. Improvements of the design of the crane in order to reduce the crane overturning moments, alleviate undesirable slewing part rotations and associated failure risks are investigated.
机译:提出了一种用于研究塔式起重机在暴露于周围建造环境引起的扰动流动的强风中的实验方法。描述塔式起重机模型上的风洞试验,塔式起重机被认为是装有单一自由度部分的刚体细长结构:起重机移动臂允许相对于垂直轴旋转。模拟几何和机械性能以再现逼真的回转部件行为。在能够模拟湍流风特性的边界层风洞中测量瞬时基座倾覆矩和回转部位位置。提高起重机的设计,以减少起重机推翻的瞬间,缓解不希望的回转部分旋转和相关的失效风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号