首页> 外文会议>International Conference on Structural and Construction Engineering >Modification of walking bridge into semi-heavy load bridge by new steel connection opener
【24h】

Modification of walking bridge into semi-heavy load bridge by new steel connection opener

机译:新型钢结构开启器改造进入半重载桥的步行桥

获取原文

摘要

A walking bridge was made by KWPA at 1992, on overflow structure, south of Iran. The traffic load forced to build a new bridge on main water channel that it should be carry semi-heavy traffic load. For each span; the one of two connections of the beam was jointed in each side and the other joint was without any connection with column. The main criterion was considered by designer into separate stiffness that the old bridge should be carry the weight of the dead load and the other stiffness should be computed to carry the live load. New steel bridge should be transferring the torsion into column that it is produced by motion of traffic live load. New opener connection could be solved the problem and it was invented by designer Afshin Turk 2002. The cost of modify bridge would be consider 7% of total cost of wide bridge (150m).
机译:一座步行桥是由KWPA制造的,1992年,伊朗南部的溢流结构。交通负荷被迫在主水道上建造一个新的桥梁,即它应该具有半重交通负荷。每个跨度;梁的两个连接中的一个在每侧接合,另一个接头没有任何与柱连接。设计师考虑了主要标准进入单独的刚度,即旧桥应承载死载的重量,并且应该计算其他刚度以携带活载。新的钢桥应该将扭转转移到列中,即通过交通活负载的运动产生。新的揭幕联系可以解决问题,它是由设计师AFShin Turk 2002发明的。修改桥的成本将考虑宽桥(150米)总成本的7%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号