Modification of walking bridge into semi-heavy load bridge by new steel connection opener

机译:新型钢连接开启器将人行天桥改造成半重载桥

获取原文
获取原文并翻译 | 示例

摘要

A walking bridge was made by KWPA at 1992, on overflow structure, south of Iran. The traffic load forced to build a new bridge on main water channel that it should be carry semi-heavy traffic load. For each span; the one of two connections of the beam was jointed in each side and the other joint was without any connection with column. The main criterion was considered by designer into separate stiffness that the old bridge should be carry the weight of the dead load and the other stiffness should be computed to carry the live load. New steel bridge should be transferring the torsion into column that it is produced by motion of traffic live load. New opener connection could be solved the problem and it was invented by designer Afshin Turk 2002. The cost of modify bridge would be consider 7% of total cost of wide bridge (150m).
机译:KWPA于1992年在伊朗南部的溢流结构上建造了一座步行桥。交通负荷迫使在主水道上建造一座新桥,应承担半重型交通负荷。对于每个跨度;梁的两个连接中的一个在每一侧都连接在一起,另一个连接与柱没有任何连接。设计者将主要标准考虑为单独的刚度,即旧桥应承受恒载的重量,而其他刚度应经计算以承受活荷载。新的钢桥应将扭转传递到由交通活载运动产生的扭转中。新的开启器连接可以解决该问题,这是由设计师Afshin Turk 2002发明的。修改桥的成本应考虑为宽桥(150m)总成本的7%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号