首页> 外文会议>International Symposium on Automation and Robotics in Construction >Dynamic Change Management for Fast-tracking Construction Projects
【24h】

Dynamic Change Management for Fast-tracking Construction Projects

机译:快速跟踪建设项目的动态变更管理

获取原文

摘要

Uncertainties make construction dynamic and unstable, mostly by creating non value-adding change iterations among construction processes. Particularly, when a project is fast-tracked without proper planning, those change iterations can cause the disruption of the construction process. For this reason, to effectively handle fast-tracking change iterations involved in fast-tracking need to be identified, and the dynamic behavior of construction resulting from those change iterations must be dealt with in a systematic manner. As an effort to address some of these challenging issues in fast-tracking construction, this research paper identifies different change iteration cycles involved in fast-tracking construction and observes the characteristics and behavior patterns of change. All of research findings are incorporated into a cohesive system dynamics model and the model simulation confirms that managerial decisions on change or rework should be made based on the proper assessment of their tradeoff. In addition, a case study of highway and bridge construction projects shows the potential of how fast-tracking construction can benefit from dynamic change management in real world settings.
机译:不确定性使施工动态和不稳定,主要是通过在施工过程中创建非值添加更改迭代。特别是,当在没有适当规划的情况下快速跟踪项目时,这些变更迭代会导致施工过程中断。因此,为了有效处理需要识别的快速跟踪所涉及的快速跟踪更改迭代,并且必须以系统的方式处理由这些变更迭代产生的施工的动态行为。作为解决快速跟踪建设中一些挑战性问题的努力,本研究论文识别了快速跟踪结构中涉及的不同变化迭代周期,并观察变革的特点和行为模式。所有研究结果都纳入凝聚力系统动力学模型,模型模拟确认,应根据对其权衡的适当评估来进行改变或返工的管理决策。此外,公路和桥梁建设项目的案例研究表明,在现实世界环境中,快速跟踪建设可以从动态变化管理中受益的潜力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号