首页> 外文会议>International Conference on Nuclear Engineering >Westinghouse owners group risk-informed regulation efforts-options 2 and 3
【24h】

Westinghouse owners group risk-informed regulation efforts-options 2 and 3

机译:Westinghouse所有者团体风险明智的监管努力 - 选择2和3

获取原文

摘要

The U.S. Nuclear Regulatory Commission (NRC) has initiated efforts to incorporate risk-informed methods to redefine the scope of the existing 10 CFR 50 regulations (Option 2) and to change the technical requirements of the regulations (Option 3). The overall objectives of these efforts are to enhance plant safety, provide a framework for risk-informed regulations, add flexibility to plant operations, and reduce regulatory burden The Westinghouse Owners Group (WOG) has a variety of active programs in the risk-informed area, including a program in the Option 2 and Option 3 areas. These two programs will be summarized including the benefits and the technical approach. The purpose of Option 2 is to make changes to the overall scope of structures, systems and components (SSCs) covered by 10 CFR 50 requiring special treatment by formulating new risk-informed safety classification categories that are linked to current definitions of safety-related and important-to-safety. This initiative would permit possible changes to the current special treatment requirements based on risk insights. The Nuclear Energy Institute (NEI) has developed an Option 2 implementation guideline (NEI 00-04 Draft Revision B). The WOG has initiated a program to validate the NEI guideline and to provide an initial cost-benefit assessment of the revised categorization and treatment under Option 2 via trial application to two systems at both Surry Unit 1 and Wolf Creek. The WOG Option 2 program includes consideration of all of the components in the selected systems, regardless of whether or not they are modeled in the respective plant probabilistic risk assessment (PRA) studies. As a result, quantitative risk measures are not available for many of the components being considered. In this case, the WOG program will provide valuable input to the NEI guideline. Additionally, the WOG program extends the use of both of the dominant methodologies for risk-informed SI (RI-ISI) to address repair and replacement activities of pressure-retaining items per Code Cases under development within ASME. Therefore, feedback is provided on the consideration of passive components for extending both the WOG and Electric Power Research Institute (EPRI) RI-IS methodologies for piping to all pressure-retaining items. In the Option 3 area, the WOG Large Break Loss-of-Coolant Accident (LBLOCA) Redefinition program is a risk-informed approach to improve select regulations (10 CFR 50.46, Appendix A, and Appendix K) such that the plant licensing basis is focused on LOCA break sizes up to a new maximum size. The new maximum break size will replace the existing requirement to consider break sizes up to and including double ended breaks of the largest primary system piping. Plants will retain the capability to mitigate a break of the largest primary system piping as evaluated using realistic success criteria and assumptions. The WOG is also providing input to the development of a risk-informed 10 CFR 50.44 based on insights from the WOG Severe Accident Management Guidance and plant-specific PRA studies.
机译:美国核监管委员会(NRC)已启动努力纳入风险通知的方法,以重新定义现有的10 CFR 50条例(备选方案2)的范围,并改变法规的技术要求(备选方案3)。这些努力的整体目标是提高植物安全,为风险知情的法规提供框架,增加了对植物业务的灵活性,并减少了西屋所有者集团(WOG)在风险通知区域中有各种积极计划的监管负担,包括选项2和选项3区域中的程序。这两个方案将总结在内,包括利益和技术方法。选项2的目的是通过制定与安全相关的当前定义相关的新的风险明智的安全分类类别,对10 CFR 50覆盖的结构,系统和组件(SSCs)的总体范围进行更改。重要的是安全。这一举措将根据风险洞察力允许对当前特殊治疗要求进行变化。核能研究所(NEI)制定了一个选项2实施方针(NEI 00-04草案B)。 WOG已启动了一个计划验证NEI指南,并通过试验应用于SURRY单元1和WOLF CREEK的两个系统提供初始成本效益评估。 WOG选项2程序包括考虑所选系统中的所有组件,无论它们是否在各自的植物概率风险评估(PRA)研究中都是模拟的。结果,对于许多正在考虑的组件,不可用的定量风险措施。在这种情况下,WOG程序将为NEI指南提供有价值的输入。此外,WOG程序扩展了对风险通知的SI(RI-ISI)的主导方法的使用,以解决在ASME内开发的每个码案例的压力保留物品的修复和更换活动。因此,关于考虑到延长WOG和电力研究所(EPRI)RI的被动部件的反馈提供了用于向所有压力保持物品管道的方法的方法。在选项3面积中,沃文大休息丧失的冷却液事故(Lbloca)重新定义计划是一种风险信息,可以改善选择法规(10 CFR 50.46,附录A和附录K),使得工厂许可是专注于Loca Break尺寸,最大限度的最大尺寸。新的最大断裂尺寸将取代现有要求,以考虑最大的主要系统管道的休息尺寸,包括双重结束的次数。植物将保留能力,以减轻最大的主要系统管道的突破,根据使用现实的成功标准和假设评估。 WOG还为开发风险通知的10 CFR 50.44的开发,基于WOG严重事故管理指导和植物特异性PRA研究的见解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号