【24h】

Gympie Gold -- The Revival of the Monkland Mine

机译:Gympie Gold - 蒙克兰矿的复兴

获取原文

摘要

Modern gold production from the Gympie Goldfield commenced in 1995 with the first production from the Monkland Mine. The primary ore target was the 2.5 m wide Inglewood Fault ore zone, which was initially mined using traditional narrow-vein shrink stoping. This manually-intensive mining method allowed the mine to re-open with minimal capital cost, however the trade off was low productivity and high operating costs. As the mine has developed, access through 100-year-old, timber-lined, small shafts, and the high cost of delineating reserves, has restricted modernisation of the operations. In early-2000 a stockwork lode was discovered adjacent to the existing workings with an economic width of 40 m. In order to maximise the benefit of such an orebody, mining needed to be approached in a new way. This paper summarises the many changes implemented at the Monkland Mine, including the necessary cultural change, implementing long-hole stoping, de-bottlenecking and the application of mechanisation. The result has been a significant improvement in safety performance, higher productivity and a more secure future for all those involved in the project.
机译:Mympie Goldfield的现代黄金生产于1995年开始,蒙克兰矿的第一个生产。主要矿石靶标是2.5米宽的Inglewood故障矿区,最初使用传统的窄静脉收缩止挡。这种手动密集的采矿方法使矿井以最少的资本成本重新开放,但折扣的生产率低,运营成本很低。由于矿山开发出,通往100岁,木材衬里,小轴和划定储备的高成本,已经限制了运营的现代化。在2000年初,在现有的工作中发现了一股百鸽,经济宽度为40米。为了最大化这种矿体的好处,需要以新的方式接近挖掘。本文总结了蒙克兰矿区实施的许多变化,包括实施长孔停止,拆除瓶颈和机械化应用的必要文化变化。结果对所有参与该项目的安全性能,更高的生产力和更安全的未来具有显着提高。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号