FERC Regulated Third-Party Compliance Monitoring and Variance Request Program ― Case Study during Construction of the Alliance Pipeline Project

机译:FERC监管的第三方合规监测和方差请求程序 - 建设联盟管道项目的案例研究

获取原文

摘要

The Federal Energy Regulatory Commission (FERC) generally monitors construction of natural gas pipelines on a periodic basis to document compliance with the environmental conditions and requirements of the Certificate issued for the project. Because monitoring is only occasional, the FERC staff is not always aware of site-specific conditions that affect construction on a daily basis. As such, decisions regarding variance requests by the pipeline company to apply alternative mitigation often require time for the FERC staff to become familiar with the conditions that may cause or initiate the requests. To increase environmental compliance during construction, and to reduce the time required for decisions regarding variance requests and alternative mitigation, Alliance Pipeline L.P. (Alliance) developed and implemented a third-party Compliance Monitoring Program in conjunction with the FERC staff. The overall objective of the program was to monitor environmental compliance during construction of the Alliance Pipeline in order to achieve a high level of environmental compliance. From Alliance's perspective, it was also important to minimize the time required for review and approval of variance requests. This was accomplished by providing a third-party compliance manager and monitors, as representatives of the FERC staff, a limited, predetermined level of decision-making authority to approve requests for variances and implementation of alternative mitigation measures. Other objectives of the program were to assist in the timely resolution of compliance issues in the field and to provide fast and accurate information to the FERC staff regarding construction conditions and progress, as well as noncompliance issues and their resolution. Implementation of this program resulted in a higher, more continuous level of compliance monitoring by the FERC staff during construction. It also allowed the staff to objectively consider and assess changes in site-specific conditions that affected construction, and apply these considerations to the assessment of environmental compliance and the review of variance requests.
机译:联邦能源监管委员会(FERC)一般在定期监测天然气管道的建设,以便遵守该项目颁布的证书的环境条件和要求。由于监测仅偶尔,FERC员工并不总是了解每天影响施工的特定现场条件。因此,有关管道公司的差异请求的决定申请替代缓解通常需要时间才能熟悉可能导致或发起请求的条件。为了增加建设期间的环境遵从性,并减少关于方差请求和替代缓解的决定所需的时间,联盟管道L.P.(联盟)制定并实施了与FERC员工一起制定和实施第三方合规监测计划。该计划的总体目标是在联盟管道建设期间监测环境遵从性,以实现高水平的环境遵从性。从联盟的角度来看,最大限度地减少审查和批准方差请求所需的时间也很重要。这是通过提供第三方合规经理和监督机构,作为FERC工作人员的代表,是批准差异请求和替代缓解措施的有限,预定的决策权限。该计划的其他目的是协助及时解决该领域的合规问题,并为FERC员工提供关于施工条件和进度的快速准确的信息,以及不合规问题及其决议。该计划的实施导致FERC工作人员在建设期间更高,更持续的合规性监测水平。它还允许工作人员客观地考虑并评估受影响建设的特定现场条件的变化,并将这些考虑应用于对环境遵从的评估和对方差请求的审查。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号